Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS7792 Markdown Content: #### GS7792 - 10 MW Solar Photovoltaic Power Plant in Rajkot, Gujarat (India) ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Stakeholder report-Revised.pdf) | 15/01/2021 | | | Other ((2)GS4GG_PDD_V01_20.01.19.pdf) | 31/05/2021 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS PDD- 7792_V02_25.10.2021_Clean Copy.pdf) | 17/11/2022 | | | Required (CDM FVR.pdf) | 19/11/2021 | | | Required (Estimated ER sheet_V02_25.10.2021.xlsx) | 19/11/2021 | | | Required (CDM PDD.pdf) | 19/11/2021 | | | Other (FVR-GS VAL-Sembcorp 10MW Solar_TQC 7720_GS7792_Clean Copy.pdf) | 17/11/2022 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Annual Report Form 2024_GS 7792.pdf) | 13/03/2025 | | | Other (Annual Report Form 2023_GS 7792.pdf) | 13/03/2025 | | | Required (MR_7792_V5.pdf) | 18/02/2025 | | | Required (GS4GG VCR_GS7792_clean.pdf) | 18/02/2025 | | | Required (ER-GS-7792_V2.1(1).xlsx) | 18/02/2025 | |