Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS7533 Markdown Content: #### GS7533 - 100 MW Solar Power plant in Maharashtra ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS PDD.docx) | 19/09/2019 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)GS PDD version 5.0_Clean.pdf) | 18/08/2020 | | | Other ((1)FVR_GS_7533 - Clean.pdf) | 18/08/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (MR_100 MW Solar Power plant Juniper_Version 3.0 Clean.pdf) | 21/09/2021 | | | Other (FVR - GS VER-Juniper clean.pdf) | 21/09/2021 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (veification report of Juniper Solar.pdf) | 29/11/2021 | | | Other (04 veification of Juniper Solar Plant Revised 07.02.2022 Clean.pdf) | 07/02/2022 | | | Other (06 ER Sheet Version 3.0.xlsx) | 07/02/2022 | | | Required (ER Sheet Version 2.0.xlsx) | 29/11/2021 | | | Required (MR Juniper Version 2 Clean.pdf) | 29/11/2021 | | | Other (02 MR Juniper Version 3.0 Clean 07.02.2022.pdf) | 07/02/2022 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (MR _ GS7533.pdf) | 14/06/2022 | | | Other (Final_FVeR_Solar Power plant Maharashtra_Clean.pdf) | 01/09/2022 | | | Required (ER sheet_ GS7533_.xlsx) | 14/06/2022 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS-MR_JUNIPER_100MW_v.05[1638]_13042023 -Clean.docx) | 13/04/2023 | | | Required (GS 7533_ ER Juniper_version 04.xlsx) | 13/04/2023 | | | Other (FVR-GS VER-Juniper-GS 7533 VER_TQC 24922 (clean)(1).pdf) | 13/04/2023 | | ###### Performance Review no. 5 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Monitoring-Report GS 7533 V7.0 - Clean.pdf) | 28/11/2023 | | | Required (ER_7533_version_03.3.xlsx) | 28/11/2023 | | | Other (Signed 100 MW Solar Power plant in Maharashtra (GS 7533) -Project-Annual-Report-Form-V2.0.pdf) | 20/12/2022 | | | Required (FVR-GS VER-Juniper Green_GS 7533 VER_TQC 7023 - Clean(1).pdf) | 28/11/2023 | | ###### Performance Review no. 6 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (VKU.F27W. Verification Report_VKU.VER.02.23_GS_7533_Clean_signed (1).pdf) | 02/03/2024 | | | Other (GS7533 Project-Annual-Report-Form.pdf) | 06/12/2023 | | | Required (ER_7533_v5 (2).xlsx) | 09/02/2024 | | | Required (MR_7533_v6 _Clean.pdf) | 02/03/2024 | | | Other (SDG-Impact-tool (7533)_05.02.2024 (1).xlsx) | 09/02/2024 | | ###### Performance Review no. 7 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (VKU.F27W. Verification Report_VKU.VER.23.23_GS_7533_Signed_Clean.pdf) | 25/06/2024 | | | Required (ER_7533_V4.0.xlsx) | 25/06/2024 | | | Required (MR_7533 V.5.0 - Clean.pdf) | 25/06/2024 | | ###### Performance Review no. 8 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (ER sheet_GS7533_ver04.xlsx) | 28/11/2024 | | | Other (SDG-Impact-tool_GS7533.xlsx) | 15/01/2025 | | | Required (ER sheet_GS7533_ver05.xlsx) | 15/01/2025 | | | Other (SDG-Impact-tool (7533)(1).xlsx) | 28/11/2024 | | | Required (Monitoring Report_GS7533_ver05 - Clean.pdf) | 15/01/2025 | | | Required (Verification Report_VKU.VER.34.24GS_7533 - Clean.pdf) | 15/01/2025 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (VKU.F26W.Validation_Report_VKU.VAL.15.24_GS_7533 - Clean.pdf) | 22/10/2024 | | | Required (ER sheet_GSRCP7533_ver04.xlsx) | 22/10/2024 | | | Required (GS_7533-SDG_Impact_tool V1.3(1).xlsx) | 22/10/2024 | | | Required (PDD_ GSRCP7533_ver04 - Clean.pdf) | 22/10/2024 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Project-Annual-Report_GS7533 for 2024.pdf) | 23/01/2025 | | ###### Performance Certification | Project no. 1 ##### Stakeholder Consultation 04/06/2025 - 04/06/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (FVR_GS7533_FVR_2025 GQ CE 68_V1.1Aa_20_05_2025_.pdf) | 26/05/2025 | | | Required (MR V3.0_GS 7533.pdf) | 26/05/2025 | | | Supporting (SDG-Impact-tool_GS7533.xlsx) | 26/05/2025 | | | Required (ER sheet V3.0_GS 7533.xlsx) | 26/05/2025 | |