Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS7572 Markdown Content: #### GS7572 - 120 MW Solar PV Plant by Juniper Green Sigma Private Ltd. in Gujarat ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (101.1-T-SCR.pdf) | 11/11/2019 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Supporting (Emission Factor Calculation Sheet_7572.xlsx) | 21/09/2020 | | | Supporting ((1)GS PDD_GS7572_V6.0_Clean.pdf) | 12/01/2021 | | | Other ((2)IRR Sheet_Juniper Gujarat.xlsx) | 22/12/2020 | | | Required (FVR_GS_7572.pdf) | 21/09/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Emission Reduction Sheet Version 02.xlsx) | 01/09/2021 | | | Required (Monitoring Report Version 02-TR Resp.pdf) | 01/09/2021 | | | Required (FVR - GS VER-Juniper Green_GS 7572_A15621.pdf) | 01/09/2021 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Emission Reduction Sheet V02.xlsx) | 24/03/2022 | | | Other (Monitoring Report V02 - Clean Copy(1).pdf) | 04/08/2022 | | | Other (FVR_GS_VER_3122_GS 7572_19.03.2022 - Clean Copy(1).pdf) | 04/08/2022 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (ER sheet_GS 7572_MP 03_(copy).xlsx) | 07/02/2023 | | | Required (FVR-GS_VER-GJ_Juniper-GS_7572_VER_TQC_A45122(1).pdf) | 26/04/2023 | | | Other (Signed 120 MW Solar PV Plant by Juniper Green Sigma Private Ltd. in Gujarat_T-PerfCert_V2.0-Project-Annual-Report-Form.pdf) | 20/12/2022 | | | Required (MR_GS 7572_version 03.pdf) | 26/04/2023 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Juniper GS 7572 V4.0 _Cleaned.pdf) | 06/09/2023 | | | Required (FVR-GS_VER-GJ_Juniper-GS VER_7572_Cleaned.pdf) | 06/09/2023 | | | Required (ER_7572_version_2.4.xlsx) | 22/09/2023 | | ###### Performance Review no. 5 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (ER_7572_V2.2.xlsx) | 06/02/2024 | | | Required (MR_7572_V2.2_Clean.pdf) | 06/02/2024 | | | Other (SDG-Impact-tool (7572)(1).xlsx) | 06/02/2024 | | | Other (GS7572 Project-Annual-Report-Form.pdf) | 06/12/2023 | | | Required (VKU.F27W. Verification Report_VKU.VER.03.23_GS_7572-Clean.pdf) | 06/02/2024 | | ###### Performance Review no. 6 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (VKU.F27W. Verification Report_VKU.VER.22.23_GS_7572_Clean.pdf) | 24/06/2024 | | | Required (MR 7572_ver04 CC.pdf) | 24/06/2024 | | | Required (ER_7572(1).xlsx) | 24/06/2024 | | ###### Performance Review no. 7 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (ER sheet_VKU.VER.33.24_GS_7572_ver03.xlsx) | 18/12/2024 | | | Required (Verification Report _VKU.VER.33.24GS_7572_Clean(1).pdf) | 18/12/2024 | | | Required (Monitoring report_VKU.VER.33.24_GS_7572_ver05_Clean.pdf) | 18/12/2024 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Project annual report GS7572 for 2024.pdf) | 23/01/2025 | | ###### Performance Certification | Project no. 1 ##### Stakeholder Consultation 04/06/2025 - 18/06/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (MR V6.0_GS_7572_TC_22-07-2025.pdf) | 24/07/2025 | | | Required (Final_FVR_2025 GQ CE 69_06-08-2025.pdf) | 08/08/2025 | | | Supporting (SDG-Impact-tool_GS7572_04072025.xlsx) | 24/07/2025 | | | Required (ER sheet V4.0_GS_7572_04-07-2025.xlsx) | 24/07/2025 | | ###### Design Certification Renewal | Project no. 1 ##### Stakeholder Consultation 17/10/2025 - 31/10/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GSRCP7572_PDD_v04.0_Clean.pdf) | 29/12/2025 | | | Supporting (GS_7572-SDG_Impact_tool V_01_.xlsx) | 13/10/2025 | | | Required (FVR 7572 GS_RCP_2725_Clean.pdf) | 29/12/2025 | | | Required (GS7572_Estimated ER Sheet_v02.xlsx) | 13/10/2025 | |