Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS5575 Markdown Content: #### GS5575 - 20 MW Solar Project in Sanwreej, Jodhpur, Rajasthan ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS Passport_28-02-2018.pdf) | 25/06/2019 | | | Supporting (PDD_11-07-2017.pdf) | 25/06/2019 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (01_2017_4616-GS_ER.xlsx) | 20/05/2024 | | | Required (01_2017_4616-GS_FCR_clean.pdf) | 20/05/2024 | | | Other (Transition_Document_v2.docx) | 20/05/2024 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (LNB_Emission_Reduction_ver.1(1).xlsx) | 09/09/2024 | | | Required (LNB_MR_ver._1(1).pdf) | 09/09/2024 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)GS.VER.20.17_GS5575_VCR Clean.pdf) | 17/08/2021 | | | Required (GS.VER.20.17_GS5575_VCR.pdf) | 09/04/2021 | | | Other (T-PerfCert_V1.1-Monitoring-Report.Version 4.0 Clean.pdf) | 17/08/2021 | | | Required (T-PerfCert_V1.1-Monitoring-Report.Version 4.0 Clean_Janardhan.pdf) | 09/04/2021 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Sanwreej (GS5575) Project-Annual-Report-Form.pdf) | 21/12/2023 | | | Other (DEV_774.pdf) | 14/08/2024 | | | Required (VKU.F27W. Verification Report_VKU.VER.01.23_GS_5575_Clean(1).pdf) | 04/12/2024 | | | Required (MR_3rd_GS5575_ver06_17.10.24_Clean.pdf) | 06/11/2024 | | | Other (GS5575 Sanwreej Annual-Report_29_12_2022.pdf) | 29/12/2022 | | | Required (ER sheet_GS5575_ver06.xlsx) | 06/11/2024 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (FVR_2024_GQ_CE_108_Performance review 01_18-02-2025_Rev 04_.pdf) | 20/02/2025 | | | Required (ER sheet_GS5575_ver 03.xlsx) | 20/02/2025 | | | Required (MR_GS5575_ver 03_28.1.25_Performance review 1_Clean Version.pdf) | 20/02/2025 | | | Other (SDG_Impact_tool V1.3_GS5575.xlsx) | 23/09/2024 | | ###### Transition Review (GS CDM to GS VER) | Document Name | Uploaded On | Download | | --- | --- | --- | | Supporting (GS5575-Transition-request-form-project.pdf) | 19/12/2023 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (SDG-Impact-tool_GS5575(2).xlsx) | 22/08/2024 | | | Required (VKU.F26W.Validation Report_VKU.VAL.04.23_GS_5575_ Clean.pdf) | 08/10/2024 | | | Required (GSRCP PDD 5575_ver05_Clean.pdf) | 08/10/2024 | | | Required (ER sheet_RCP_5575_ver03 (1).xlsx) | 22/08/2024 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Project-Annual-Report_GS5575 for 2024.pdf) | 22/01/2025 | |