Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS6290 Markdown Content: #### GS6290 - 200 MW Wind Power Project in Tamil Nadu by Orange Sironj ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (PDD_01.29.2018_v1.pdf) | 11/08/2019 | | | Required (PDD_04.25.2018_v2.docx) | 11/08/2019 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (FVR-5617-GS VER-CLEAN.pdf) | 21/08/2019 | | | Other (GS PDD ver 05- Clean.pdf) | 02/01/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Monitoring Report_monitoring period_07-03-2019 to 31-12-2019_v2.pdf) | 01/12/2020 | | | Required (Monitoring Report_monitoring period_07-03-2019 to 30-09-2019_v2.pdf) | 01/12/2020 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS4GG_Verification_report_CLEAN.pdf) | 06/05/2021 | | | Other (T-PerfCert_V1.1-Monitoring-Report GS6290_Clean.pdf) | 06/05/2021 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Monitoring-Report 200 MW Version3_final.doc) | 08/07/2022 | | | Required (FVR verification_GS 6290_TQC 7122_final.docx) | 08/07/2022 | | | Required (ER sheet _Orange Sironj_final.xlsx) | 08/07/2022 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (ER sheet_GS 6290.xlsx) | 23/04/2024 | | | Other (GS6290 Orange Sironj Annual-Report_22_12_2022.pdf) | 29/12/2022 | | | Required (Monitoring-Report_Sironj 200 MW_GS 6290_v4.0_CL.pdf) | 17/09/2024 | | | Required (FVeR_GS 6290 TQC 9023_v3.0_CL.pdf) | 17/09/2024 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (ER sheet_RCP_GS-6290_V3.0_Clean.xlsx) | 29/07/2024 | | | Other (FVeR_GS 6290.pdf) | 22/07/2024 | | | Required (VKU.F26W.Validation Report_VKU.VAL.07.23.GS_6290_V3.1_Clean.pdf) | 29/07/2024 | | | Required (6290_SDG-Impact-tool(1).xlsx) | 24/05/2024 | | | Required (GS-6290_PDD_V5.0_Clean.pdf) | 29/07/2024 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Project-Annual-Report_GS6290 for 2024.pdf) | 30/12/2024 | |