Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS7078 Published Time: Wed, 11 Feb 2026 08:48:26 GMT Markdown Content: #### GS7078 - 216 MWac Adani Green Energy (Tamilnadu) Solar Power Project ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (DEV_273.pdf) | 12/09/2024 | | | Required (GS PDD_AGETL ver. 3.0.pdf) | 07/05/2019 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GCEES1420-CDM- VAL report.pdf) | 21/09/2020 | | | Required (GS4GGValidation Report_GS7078.pdf) | 21/09/2020 | | | Required ((1)CDM PDD_AGETL.pdf) | 21/09/2020 | | | Other (AGETL SCR.pdf) | 05/01/2021 | | | Required (GS ER Sheet_AGETL.xlsx) | 21/09/2020 | | | Required (GS PDD_AGETL.pdf) | 21/09/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (7078_annual report.pdf) | 30/06/2022 | | | Other (2. ER Sheet _AGETL Ver03(1).xlsx) | 23/05/2022 | | | Other (MR_AGETL ver05 - Clean.pdf) | 21/06/2022 | | | Other (7078_FVR - CLEAN.pdf) | 23/05/2022 | | | Other (7078_deviation request form.pdf) | 30/06/2022 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Annual Report_GS_7078_2021-22.pdf) | 30/12/2022 | | ###### Transition Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (7078_TRF_V02.pdf) | 15/04/2022 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GSRCP_216MW_TN_PDD_V3_CC.pdf) | 03/12/2024 | | | Other (SDG-Impact-tool_GSRCP_216MW(1).xlsx) | 03/12/2024 | | | Other (Validation Report-RCP-2_CDM-GS7078_TRR01_TA-V2_CC.pdf) | 03/12/2024 | | | Other (GSRCP_216MW_TN_ER_Sheet_V1(1).xlsx) | 03/12/2024 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Annual-Report_2024-GS7078.pdf) | 28/01/2025 | | ###### Performance Certification | Project no. 1 ##### Stakeholder Consultation 11/08/2025 - 25/08/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (VKU.F27W.Verification_Report_VKU.VER.49.25_GS_7078.pdf) | 05/08/2025 | | | Required (ER Sheet _7078_Adani_ Tamilnadu 216 MW-3.xlsx) | 05/08/2025 | | | Supporting (SDG-Impact-tool_GS 7078_216 MW Adani Green Energy Tamil Nadu Solar Power Project.xlsx) | 05/08/2025 | | | Required (MR_7078_Adani_ Tamilnadu 216 MW.pdf) | 05/08/2025 | |