Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS5928 Markdown Content: #### GS5928 - 2x50 MW Orange Suvaan Solar Photovoltaic Power Project in Maharashtra, India ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS Passport_08.25.2018_v5.pdf) | 08/06/2019 | | | Required (PDD_10.25.2018_v5.pdf) | 08/06/2019 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Final Verification Report_1st monitoring period_16-06-2017 to 30-06-2018_v2.pdf) | 30/11/2020 | | | Required (Monitoring Report_1st monitoring period_16-06-2017 to 30-06-2018_v2.pdf) | 30/11/2020 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Monitoring Report_monitoring period_01-07-2018 to 31-01-2020_v2.pdf) | 30/11/2020 | | | Required (Final Verification Report_monitoring period_01-07-2018 to 31-01-2020_v1.pdf) | 30/11/2020 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Emission Reduction Calculation_Suvaan MP3.xlsx) | 14/09/2021 | | | Other (Monitoring-Report MP3 (Clean).pdf) | 21/10/2021 | | | Other (FVR verification_GS_5928_Clean.pdf) | 21/10/2021 | | ###### Transition Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS5928_Suvaan_Transition-Annex_v2.pdf) | 06/05/2020 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS5928_Annual report 2022 Suvaan.pdf) | 11/01/2024 | | | Required (FVR-GS VER-GS 5928 VER_TQC_9223 - C Copy.pdf) | 28/06/2024 | | | Other (5928 Project-Annual-Report-Form 2023.pdf) | 11/01/2024 | | | Required (Emission reduction sheet _5928 final.xlsx) | 27/06/2024 | | | Required (MR_5928_V.5 CC.pdf) | 27/06/2024 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (DEV_727.pdf) | 12/07/2024 | | | Required (ER sheet_GSRCP 5928_Version 02.xlsx) | 02/01/2025 | | | Required (ER sheet_GSRCP 5928.xlsx) | 13/06/2024 | | | Required (SDG_Impact_tool V1.3_GS5928.xlsx) | 02/01/2025 | | | Required (PDD GSRCP 5928 V.4.0_CLEAN.pdf) | 02/01/2025 | | | Required (VKU.F26W.Validation Report_VKU.VAL.16.24_GS_5928 V.2.0.pdf) | 13/06/2024 | | | Required (PDD GSRCP 5928 V.3.0.pdf) | 13/06/2024 | | | Required (SDG-Impact-tool_GS5928.xlsx) | 13/06/2024 | | | Required (VKU.F26W.Validation Report_VKU.VAL.16.24_GS_5928 V.3.0_CLEAN.pdf) | 02/01/2025 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Project-Annual-Report_GS5928 for 2024.pdf) | 30/12/2024 | |