Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS7553 Markdown Content: #### GS7553 - 42 MWp Bundled Solar Photovoltaic Power project in Indonesia ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (SCR_Solar.pdf) | 03/12/2019 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Indonesia_Solar_42MW_GS_PDD_v3-TC.pdf) | 06/01/2021 | | | Other (FVR-A ID-5419-TC.pdf) | 06/01/2021 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (FVR verification_GS 7553_TQC 9121_AR_Clean.pdf) | 16/10/2021 | | | Other (Emission Reduction Calculation Sheet_Solar v2.1.xlsx) | 16/10/2021 | | | Other (Monitoring-Report_Indo Solar_v2.1-14102021 (Clean).pdf) | 16/10/2021 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Monitoring-Report_Vena Indonesia Solar (Clean).pdf) | 12/06/2023 | | | Other (GS Verification report _Indonesia Solar_Clean.pdf) | 12/06/2023 | | | Other (Emission Reduction Calculation Sheet_Solar v2(2).xlsx) | 12/06/2023 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (SDG-Impact-tool_GS7553.xlsx) | 01/07/2024 | | | Other (Project-Design-Document_Indonesia Solar (Clean).pdf) | 18/02/2025 | | | Required (Indonesia_Solar 42MW_GS_ER_v4.1.xlsx) | 01/07/2024 | | | Other (GS RCP Validation Report_GS7553_Clean.pdf) | 18/02/2025 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Project-Annual-Report_GS 7753.pdf) | 31/12/2024 | | ###### Annual Report no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Project-Annual-Report_GS 7553-2024.pdf) | 25/12/2025 | |