Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS7139 Markdown Content: #### GS7139 - 50 MW (DCR) Nalgonda Solar PV Power Project by Parampujya Solar Energy at Telangana ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (DEV_271.pdf) | 10/09/2024 | | | Required (GS PDD PSEPL_DCR.pdf) | 10/12/2018 | | | Supporting (CDM_PDD_PSEPL_DCR.pdf) | 10/12/2018 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS PDD PSEPL_DCR_V.06_CLEAN.pdf) | 07/01/2021 | | | Other ((1)Validation Report_GS7139.pdf) | 17/12/2020 | | | Required (GCEES1820-CDM- VAL report-TLG.pdf) | 01/10/2020 | | | Other (GS ER Sheet_PSEPL_DCR_Ver 2.0.xlsx) | 17/12/2020 | | | Required ((1)CDM_PDD_PSEPL_DCR.pdf) | 01/10/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (7139_FVR_V06_Clean(1).pdf) | 05/12/2022 | | | Required (ER Nalgonda DCR (2).xlsx) | 25/09/2021 | | | Other (7139_annual report.pdf) | 30/06/2022 | | | Other (7139_MR_V06_Clean.pdf) | 05/12/2022 | | | Other (7139_deviation request form.pdf) | 30/06/2022 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Annual Report_GS_7139_2021-22.pdf) | 30/12/2022 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GSRCP_50MW_TELANGANA_ER_Sheet_V2(1).xlsx) | 14/02/2025 | | | Other (GSRCP_50MW_TELANGANA_PDD_V3.0_GS 7139_CC.pdf) | 14/02/2025 | | | Required (GSRCP_50MW_TELANGANA_ER_Sheet_V2.xlsx) | 14/11/2023 | | | Required (SDG-Impact-tool_GSRCP_50MW_TELANGANA.xlsx) | 14/11/2023 | | | Other (Validation Report-RCP-2_CDM-GS7139_CC.pdf) | 14/02/2025 | | | Other (SDG-Impact-tool_GSRCP_50MW_TELANGANA(1).xlsx) | 14/02/2025 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Annual-Report_2024_GS7139.pdf) | 28/01/2025 | | ###### Performance Certification | Project no. 1 ##### Stakeholder Consultation 30/11/2025 - 12/12/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (ER Sheet_7139.xlsx) | 25/11/2025 | | | Required (VKU.F27W.Verification_Report_VKU.VER.47.25_GS_7139.pdf) | 25/11/2025 | | | Supporting (SDG-Impact-tool_7139.xlsx) | 25/11/2025 | | | Required (MR _GS 7139_Version 05.pdf) | 25/11/2025 | |