Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS7138 Markdown Content: #### GS7138 - 50 MW Kurnool Solar PV Power Project by M/s Prayatna Developers Pvt. Ltd. at Gani, Kurnool, AP. ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (DEV_262.pdf) | 10/09/2024 | | | Other ((1)GS PDD PDPL AP ver. 03_Clean.pdf) | 11/04/2019 | | | Supporting (CDM PDPL_PDD_AP.pdf) | 10/12/2018 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)CDM PDPL_PDD_AP.pdf) | 30/09/2020 | | | Required (CDM- VAL report-AP.pdf) | 30/09/2020 | | | Other (Bundled GS PDD V.05_Clean.pdf) | 18/12/2020 | | | Required ((1)GS PDD PDPL AP.pdf) | 30/09/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (7138_ER sheet_v03(1).xlsx) | 21/06/2022 | | | Other (7138_annual report.pdf) | 18/06/2022 | | | Other (7138_GS_FVR_v05 - clean.pdf) | 21/06/2022 | | | Other (7138_deviation request form_SC_FINAL.pdf) | 18/06/2022 | | | Other (7138_MR VER 04 -Clean.pdf) | 21/06/2022 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Annual Report_GS_7138_2021-22.pdf) | 30/12/2022 | | ###### Transition Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (7138_TRFv02.pdf) | 16/04/2022 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GSRCP 7138_50MW_KURNOOL_PDD_V6.0_CC.pdf) | 10/04/2025 | | | Other (Validation Report-RCP-2_CDM-GS7138-Clean.pdf) | 10/04/2025 | | | Other (GSRCP_50MW_KURNOOL_ER_Sheet_V2.0(1).xlsx) | 10/04/2025 | | | Other (SDG-Impact-tool_GSRCP_50MW_KURNOOL(1).xlsx) | 10/04/2025 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Annual-Report_2024_GS7138.pdf) | 28/01/2025 | | ###### Performance Certification | Project no. 1 ##### Stakeholder Consultation 06/09/2025 - 19/09/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (MR _GS 7138_R2 Version 05_Clean.pdf) | 01/10/2025 | | | Required (VKU.F27W.Verification_Report_VKU.VER.46.25_GS_7138-Clean.pdf) | 01/10/2025 | | | Required (7138_ER sheet_version 05.xlsx) | 01/10/2025 | | | Supporting (SDG-Impact-tool_7138..xlsx) | 01/10/2025 | |