Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS4962 Markdown Content: #### GS4962 - Wind Power Project in Madhya Pradesh by OBWPPL ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS4962 Validation Report 03.04.2018.pdf) | 27/11/2020 | | | Supporting (PDD_22-03-18.pdf) | 19/06/2019 | | | Other (GS Passport 11.06.2018_v5.pdf) | 17/01/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)Monitoring Report_1st monitoring period_05.05.2016 to 31.03.2018_v2.1.pdf) | 27/11/2020 | | | Other ((1)Verification Report_1st monitoring period_05.06.2016 to 31.03.2018_rev4.pdf) | 27/11/2020 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (T-PerfCert_V1.1-Monitoring-Report BERCHA Version 2.0 Clean.pdf) | 07/05/2021 | | | Other (GS4962_ER- Version_v2.0.xlsx) | 29/06/2021 | | | Required (GS.VER.20.27_GS4962_VCR.pdf) | 07/05/2021 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Monitoring-Report-Bercha-V02.pdf) | 15/09/2021 | | | Other (Monitoring-Report-Bercha-V03 (Clean).pdf) | 26/10/2021 | | | Required (FVR - GS VER-Orange Bercha_TQC -GS4962-TR29.08.2021.pdf) | 15/09/2021 | | | Other (FVR - GS VER-Orange Bercha_TQC -GS4962-GS Review R1 (Clean).pdf) | 26/10/2021 | | | Required (Emission Reduction Calculation_Bercha- Ver-02-TR.xlsx) | 15/09/2021 | | | Other (Emission Reduction Calculation_Bercha- Ver-03.xlsx) | 26/10/2021 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Monitoring-Report_Bercha_50 MW_GS4962_ver05_Cleaned.pdf) | 08/07/2024 | | | Required (FVR-GS_VER-GS 4962_12923_PRR-R1_Cleaned.pdf) | 08/07/2024 | | | Other (SDG-Impact-tool_GS4962(1).xlsx) | 01/03/2024 | | | Required (ER sheet_GS4962_ver 05.xlsx) | 01/03/2024 | | | Other (GS4962_Annual Report_50 MW Orange Bercha.pdf) | 01/03/2024 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Deviation-Request-Form_GS4962_50 MW_DEV_536.pdf) | 06/10/2023 | | | Required (FVR_GS 4962.pdf) | 01/08/2023 | | | Required (SDG-Impact-tool_GS4962.xlsx) | 01/08/2023 | | | Required (ER sheet_RCP_GS4962(2).xlsx) | 06/12/2023 | | | Required (GS RCP_PDD_4962_Clean.pdf) | 06/12/2023 | | | Other (Deviation_GS4962_GreenkoBercha_50MW_DEV_523 (1).pdf) | 22/09/2023 | | | Required (FVR_GS 4962_Clean(1).pdf) | 06/12/2023 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Project-Annual-Report_GS4962 for 2024.pdf) | 30/12/2024 | |