Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS744 Published Time: Wed, 11 Feb 2026 08:48:26 GMT Markdown Content: #### GS744 - 60 MW Bandirma Wind Power Plant Project ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS Passport_11.26.2013.pdf) | 10/06/2019 | | | Required (PDD_09.04.2012_v8.pdf) | 10/06/2019 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)Monitoring Report_1st monitoring period_08.01.2015 to 07.31.2017_v5.doc) | 28/02/2020 | | | Required ((1)Verification Report_1st monitoring period_08.01.2015 to 07.31.2017_v1.4.pdf) | 28/02/2020 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS_VER_REP_60 MW Bandirma WPP_19TQMD29_Rev 3.0Aa_25052021.pdf) | 28/05/2021 | | | Other (Bandırma WPP_Transition-Annex_v3_20200224_clean.docx) | 24/02/2020 | | | Other ((1)Bandırma WPP_MR_v7_clean_15042021.docx) | 28/05/2021 | | | Required (Bandırma WPP_2nd Verification_ER_v6_20201228.xlsx) | 19/02/2021 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS744 Bandırma WPP_Annual Report_2020(1).doc) | 22/07/2022 | | | Other (GS744 Bandırma WPP_Annual Report_2020.doc) | 22/07/2022 | | | Required (Final_ER Calculations_Bandırma WPP_v04_15-11-2023.xlsx) | 22/11/2023 | | | Other (Final_Ver Report_Bandirma WPP_v01.2_09-01-2024.pdf) | 09/01/2024 | | | Other (Bandırma WPP-Project-Annual-Report-Form_2021.pdf) | 26/12/2022 | | | Other (T-PerfCert_V2.0-Project-Annual-Report-Form_Bandırma WPP.pdf) | 25/12/2023 | | | Other (Final_MR_Bandırma WPP_v05_clean_08-01-2024.docx) | 09/01/2024 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Final_ER Calculations_Bandirma WPP_v04_15-10-2024.xlsx) | 24/10/2024 | | | Other (Final_Ver Report_Bandirma WPP_v01.2_02-01-2025.pdf) | 07/01/2025 | | | Other (430_V1.3_IQ_SDG-Impact-tool_Bandirma WPP CP1.xlsx) | 07/01/2025 | | | Other (Final_MR_Bandirma WPP_v05_30-12-2024 clean.pdf) | 07/01/2025 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (PDD_Bandırma WPP_v13_14-09-2023_clean.docx) | 14/09/2023 | | | Other (Final_SDG Impact Tool_Bandırma WPP_v02_26-04-2023.xlsx) | 12/05/2023 | | | Other (Final_Val Report_Bandirma WPP_v02.1_02-10-2023.pdf) | 15/11/2023 | | | Required (Final_ER Calculations_Bandırma WPP_v02_22-07-2022.xlsx) | 22/07/2022 | | ###### Performance Review no. 5 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Final_Ver Report_Bandirma WPP_2nd CP_v01.2_18-12-2024.pdf) | 24/12/2024 | | | Other (Final_SDG Impact Tool_Bandırma WPP_v01_12-12-2024.xlsx) | 24/12/2024 | | | Other (Final_MR_Bandirma WPP_v05_12-12-2024 clean.pdf) | 24/12/2024 | | ###### Annual Report no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS744-Bandirma WPP-Project-Annual-Report 2023_v2.pdf) | 09/01/2025 | | ###### Annual Report no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS744_BandirmaWPP_AnnualReport_2024.pdf) | 23/12/2025 | |