Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS5519 Markdown Content: #### GS5519 - 70 MW Bhadla Solar power plant by Fortum Finnsurya Energy Pvt Ltd (EKIESL-CDM-APRIL 16-01) ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Supporting (PDD_04-08-2017.pdf) | 13/06/2019 | | | Other (GS Passport_09-01-2018.pdf) | 13/06/2019 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)Monitoring Report_1st monitoring period_06-11-2017 to 01-04-2019_v02.pdf) | 04/12/2020 | | | Required ((1)Verification Report_1st monitoring period_06-11-2017 to 01-04-2019_v02.pdf) | 04/12/2020 | | | Required (Verification Report_1st monitoring period_06-11-2017 to 01-04-2019_v02.pdf) | 04/12/2020 | | | Required (Monitoring Report_1st monitoring period_06-11-2017 to 01-04-2019_v02.pdf) | 04/12/2020 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (MR GS GS5519.pdf) | 01/02/2021 | | | Required (Final GS Verification report- 70 MW.pdf) | 01/02/2021 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (10403_CDM_MR_MP03_Ver02 - Clean.pdf) | 23/02/2022 | | | Required (10403_CDM FVR_MP03_Ver02.pdf) | 23/02/2022 | | | Required (5519_FVR.pdf) | 03/12/2021 | | | Required (5519_MR_MP04_ver02 - Clean.pdf) | 03/12/2021 | | ###### Transition Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (5519_TRF_V02 - Clean.pdf) | 04/04/2022 | | ###### Performance Review no. 5 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS_5519_MR_v05_04.09.2023_Cleaned(1).pdf) | 05/10/2023 | | | Required (FVeR_GS 5519_ITR1_Cleaned(1).pdf) | 05/10/2023 | | | Required (GS_5519_ER_Sheet_v03_03.05.2023.xlsx) | 14/06/2023 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (5519_RCP_ER_V02.xlsx) | 04/11/2022 | | | Other (FVR 5519_RCP_TQC 25122(2).pdf) | 09/03/2023 | | | Required (5519_SDG_Impacts_ver01.xlsx) | 04/11/2022 | | | Other (5519_RCP_PDD_V03_Clean(1).pdf) | 17/01/2023 | | ###### Performance Review no. 6 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS_5519_MR_ver04_TC_01.05.2024 Clean.pdf) | 06/06/2024 | | | Other (GS_5519_430_V1.1_IQ_SDG-Impact-tool_01.05.2024.xlsx) | 06/06/2024 | | | Required (VKU.F27W. Verification Report_VKU.VER.15.23_GS_5519.pdf) | 06/06/2024 | | | Required (GS_5519_MR_ver03_Final_28.02.2024.pdf) | 12/03/2024 | | | Required (GS_5519_ER_Sheet_v03_01.05.2024.xlsx) | 06/06/2024 | | | Other (GS_5519_Annual Report_2022-23_26.12.2023.pdf) | 29/12/2023 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Annual Report_5519_2023.pdf) | 26/12/2024 | | ###### Performance Certification | Project no. 1 ##### Stakeholder Consultation 16/07/2025 - 30/07/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (MR_5519 v4 Track change.pdf) | 09/09/2025 | | | Required (VKU.F27W.Verification_Report_VKU.VER.43.25_GS_5519-PUBLIC_clean PRR1.pdf) | 09/09/2025 | | | Required (ER Sheet_5519-v4.xlsx) | 09/07/2025 | | | Supporting (SDG-Impact-tool__v1.0.xlsx) | 09/07/2025 | | ###### Annual Report no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Annual-Report_2024_GS5519.pdf) | 29/12/2025 | | ###### Annual Report no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Annual-Report_2025_GS5519.docx.pdf) | 06/02/2026 | |