Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS7080 Markdown Content: #### GS7080 - 72 MWac Ramnad Solar Power Project ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (DEV_272.pdf) | 12/09/2024 | | | Supporting (CDM PDD_RSPL.pdf) | 06/12/2018 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS PDD_RSPL ver 5.0_TC.pdf) | 17/11/2020 | | | Other (RSPL SCR.pdf) | 17/11/2020 | | | Other ((1)Validation Report_GS7080.pdf) | 17/11/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (7080_deviation request form.pdf) | 30/06/2022 | | | Other (7080_annual report.pdf) | 30/06/2022 | | | Other (7080_FVR_v06_ CLean.pdf) | 13/06/2022 | | | Other (7080_MR_v05_TC - Clean.pdf) | 13/06/2022 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Annual Report_GS_7080_2021-22.pdf) | 30/12/2022 | | ###### Transition Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (T-PreReview_V1.0-Transition-request-form-project - 7080.pdf) | 26/02/2022 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GSRCP_72MW_RAMNAD_PDD_ver03_Clean_05.04.2024.pdf) | 14/08/2024 | | | Required (GSRCP_72MW_RAMNAD_ER_Sheet_V1.xlsx) | 17/10/2023 | | | Required (SDG-Impact-tool_GSRCP_72MW_RAMNAD.xlsx) | 17/10/2023 | | | Required (Final_FVR GS RCP 7080.QA_ver2_CC.pdf) | 14/08/2024 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Annual-Report_2024_GS7080.pdf) | 28/01/2025 | | ###### Performance Certification | Project no. 1 ##### Stakeholder Consultation 06/09/2025 - 19/09/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (VKU.F27W.Verification_Report_VKU.VER.51.25_GS_7080-Clean.pdf) | 16/10/2025 | | | Required (MR_GS 7080_72 MW Ramnad Solar Project-Clean.pdf) | 16/10/2025 | | | Supporting (SDG-Impact-tool_GS 7080_72MW Ramnad Solar Project updated.xlsx) | 16/10/2025 | | | Required (ER Sheet _GS 7080_72 MW Ramnad Solar Project Updated.xlsx) | 16/10/2025 | | ###### Annual Report no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Annual-Report_2023_GS 7080.pdf) | 23/09/2025 | |