Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS7589 Markdown Content: #### GS7589 - 9.6 MW Wind Energy Project at Jamvadi & Navagam & Kalavad, Jamnagar, Gujarat, India of Rohit Surfactants Pvt. Ltd. ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (SCR- GS 7589.pdf) | 19/04/2021 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS_7589_estimatedER-sheet_v01.xlsx) | 28/04/2022 | | | Other (GS_7589_SD-Tool_v03.xlsx) | 03/10/2022 | | | Other (FVR val_GS_7589_TQC _v02_Clean(1).pdf) | 03/10/2022 | | | Required (FVR val_GS_7589_TQC 24421.pdf) | 28/04/2022 | | | Required (PDD_GS7589_v02_15032022_clean_1.pdf) | 28/04/2022 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (FVR ver_GS 7589_TQC 24421.pdf) | 28/04/2022 | | | Required (GS7589_ER_Sheet_V01_15032022.xlsx) | 28/04/2022 | | | Required (MR_GS7589_v02_15032022_Clean.pdf) | 28/04/2022 | | | Other (MR_GS7589_v04_Clean.pdf) | 03/10/2022 | | | Other (FVR ver_GS 7589_v03_TC.pdf) | 03/10/2022 | | | Other (GS_7589_SD-Tool_Performance_01.xlsx) | 01/03/2023 | | | Other (GS_7589_ER_Sheet_ver03.xlsx) | 03/10/2022 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS 7589 Annual report .pdf) | 26/12/2023 | | | Other (GS 7589 Annual report.pdf) | 30/12/2022 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS 7589 Annual Report 2024_RSPL.pdf) | 26/12/2025 | |