Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS3031 Markdown Content: #### GS3031 - Afforestation Project in Tongliao, Inner Mongolia ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (2.1 - Tongliao_Key Project Information(1).pdf) | 01/02/2023 | | | Required (3.5 - Tongliao_Terms and conditions.pdf) | 01/02/2023 | | | Required (3.5 - Tongliao_Cover Letter.pdf) | 01/02/2023 | | | Required (3.2 - Tongliao_Local Stakeholder Consultation.pdf) | 01/02/2023 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Tongliao - Validation Report(1).pdf) | 01/02/2023 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Tongliao_FVerR_Performance Certification_New Area_20210625.pdf) | 01/02/2023 | | | Other (GS3031_Project-Annual-Report_01-01-2022 to 31-12-2022.pdf) | 28/12/2023 | | | Required (3.4 - Tongliao_Sustainability-Monitoring-Plan-clean.pdf) | 01/02/2023 | | | Other (7.2 - Template - Annual Report-clean(1).pdf) | 01/02/2023 | | | Required (5.7 - Tongliao_CO2-Fixation Calulation-MR-clean.xlsx) | 01/02/2023 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (05-Tongliao_AR_GS_ CO2-Fixation calculation of 2nd MP-20240806.xlsx) | 25/03/2025 | | | Required (04-Tongliao_AR_GS3031-Monitoring-Report-20250321-clean.pdf) | 25/03/2025 | | | Required (07-Tongliao_AR_GS3031_Final Performance Certification Report_CC.pdf) | 25/03/2025 | | ###### Transition Review (Previous GS VERSION to GS4GG) | Document Name | Uploaded On | Download | | --- | --- | --- | | Supporting (Tongliao_Cover letter_2021(1).pdf) | 01/02/2023 | | | Supporting (Tongliao_Terms and conditions_2021(1).pdf) | 01/02/2023 | | | Required (Transition-Annex-tongliao-20210625-clean.pdf) | 01/02/2023 | | ###### Design Change Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (02-Tongliao_AR_GS3031_CO2-Fixation Calulation-PD-clean-20240806.xlsx) | 25/03/2025 | | | Required (01-Tongliao_AR_GS3031_Project-Design-Document-20240925-clean.pdf) | 25/03/2025 | | | Required (06-Tongliao_AR_GS3031_FINAL Design Certification Renewal Report_CC.pdf) | 25/03/2025 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS3031-Project-Annual-Report-2024.pdf) | 20/11/2025 | |