Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS399 Markdown Content: #### GS399 - Alize Camseki 20.8 MW Wind Farm Project, Turkey (300209) ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (PDD_03-07-2008.pdf) | 05/09/2020 | | | Other (Final Validation Report Camseki Uvecik Wind Project 06_2010 final_29_06_10.pdf) | 30/07/2019 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)Verification Report_1st monitoring period_01-07-09 to 31-08-10_v3.0.pdf) | 25/02/2020 | | | Required ((1)Monitoring Report_1st monitoring period_01-07-09 to 31-08-10_v1.4.pdf) | 25/02/2020 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)Verification Report_2nd monitoring period_01-09-10 to 31-10-11_v5.0.pdf) | 25/02/2020 | | | Required ((1)Monitoring Report_2nd monitoring period_01-09-10 to 31-10-11_v1.3.pdf) | 25/02/2020 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)Monitoring Report_3rd monitoring period_01-11-11 to 31-08-12-v1.4.pdf) | 25/02/2020 | | | Required ((1)Verification Report_3rd monitoring period_01-11-11 to 31-08-12-v1.2.pdf) | 25/02/2020 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Alize-Project Owner Explanation ref ER double counting-20220815(1).pdf) | 25/10/2022 | | | Required (Final_SDG Impact Tool_877 Camseki Wind_v0.1_01-05-2022.xlsx) | 01/07/2022 | | | Other (Alize Camseki 20.8 Wind Farm Project_PDD_v05_wtc.pdf) | 25/10/2022 | | | Other (Final_Val Report_877 Camseki Wind_Seda Atabek_v04_25-10-2022.pdf) | 25/10/2022 | | ###### Performance Review no. 5 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (DEV_640.pdf) | 05/04/2024 | | | Other (T-PerfCert_V2.0-Project-Annual-Report of Camseki WPP_2022.pdf) | 29/12/2023 | | ###### Performance Review no. 6 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Final_MR_ 1047 Çamseki Wind-VER_v02_23-05-2024.pdf) | 05/06/2024 | | | Required (Final_ER calculations_1047 Çamseki Wind-VER_v0.3_26-05-2024.xlsx) | 05/06/2024 | | | Required (Final_Ver Report_1047 Çamseki Wind-VER_İrem Taşkıran_v02_30-05-2024.pdf) | 05/06/2024 | | ###### Crediting Period Renewal no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Final_ER calculations_Camseki WPP_v0.3.xlsx) | 12/06/2023 | | | Required (Final_SDG Impact Tool_Camseki WPP _v0.1.xlsx) | 12/06/2023 | | | Required (Final_CP Renewal Val Report_1098 Camseki Wind_Seda Atabek_v05_23-12-2023_wotc.pdf) | 23/12/2023 | | | Other (Alize Camseki 20.8 Wind Farm Project_PDD_v04_wotc(1).pdf) | 18/10/2023 | | ###### Performance Review no. 7 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (T-PerfCert_V2.0-Project-Annual-Report of Camseki WPP_2023.pdf) | 02/12/2024 | | ###### Annual Report no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (T-PerfCert_v3.0-Project-Annual-Report_Camseki WPP_2024.pdf) | 12/11/2025 | |