Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS5920 Markdown Content: #### GS5920 - ALTACA MERAM BIOGAS PLANT ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Meram_biogas LSC_GTE_22112019.pdf) | 22/11/2019 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Final_PDD_650 Meram biogas_v09_29.08.2023_track_change.docx) | 09/01/2024 | | | Required (Final_SDG Impact Tool_650 Meram biogas_19-11-2022.xlsx) | 21/11/2022 | | | Other (Final_Val Report_650 Meram biogas_Sandeep Kanda_v06_08-01-2024_clean version.pdf) | 09/01/2024 | | | Other (IRR calculations_Meram Biogas Plant_29.08.2023_v5.xlsx) | 09/01/2024 | | | Required (Final_ER calculations_650 Meram biogas_v04_19-11-2022.xlsx) | 21/11/2022 | | | Other (T-V4 0-Deviation-Request-Form_meram biogas-11-2021_final.pdf) | 07/01/2022 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (T-PerfCert_V2.0-Project-Annual-Report-Form_Altaca_Meram_Biogas_Plant_2022.pdf) | 28/12/2023 | | ###### Annual Report no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS5920-T-PerfCert_v3.0-Project-Annual-Report_update.pdf) | 02/01/2025 | | ###### Performance Certification | Project no. 1 ##### Stakeholder Consultation 15/02/2025 - 28/02/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS-5920_Meram-MR_15042025_CLEAN.pdf) | 25/04/2025 | | | Required (GS.VER.24.19_Meram_FVR_v7.0-20250618_CLEAN_180625.pdf) | 19/06/2025 | | | Required (ER_Calculation_Sheet-MERAM_ confidential.xlsx) | 25/04/2025 | | | Supporting (430_V1.3_IQ_SDG-Impact-tool_Meram Biogas.xlsx) | 07/02/2025 | | ###### Annual Report no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS5920-T-PerfCert_v3.0-Project-Annual-Report_2024.pdf) | 31/12/2025 | |