Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS817 Published Time: Wed, 11 Feb 2026 08:48:26 GMT Markdown Content: #### GS817 - Arakalagudu Biodigester Project II ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS817 Cover Letter.pdf) | 13/03/2020 | | | Required (GS817 Local Stakeholder Consultation Report 03.01.2010.pdf) | 13/03/2020 | | | Required ((2)PDD_12.23.2010_v4.pdf) | 07/05/2021 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)GS Validation Report_24.12.2010_rev4.pdf) | 07/05/2021 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((5)Monitoring Report_1st monitoring period_01.02.2010 to 31.12.2010_v2.pdf) | 08/05/2021 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((5)Monitoring Report_2nd monitoring period_01.01.2011 to 31.12.2011_v1.docx) | 08/05/2021 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((5)Monitoring Report_3rd monitoring period_01.01.2012 to 31.12.2012_v1.pdf) | 08/05/2021 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((4)Monitoring Report_4th monitoring period_01.01.2013 to 31.12.2013_v2.docx) | 08/05/2021 | | ###### Performance Review no. 5 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((4)Monitoring Report_5th monitoring period_01.01.2014 to 31.12.2014_v2.pdf) | 08/05/2021 | | ###### Performance Review no. 6 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((5)Monitoring Report_6th monitoring period_01.01.2015 to 31.12.2015_v2.pdf) | 08/05/2021 | | ###### Internal Verification no. 10 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Monitoring Report_8th monitoring period_01.01.2018 to 31.01.2020_v3.pdf) | 07/05/2021 | | ###### Performance Review no. 10 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Monitoring Report_10th monitoring period_01.01.2018 to 31.01.2020_v3.pdf) | 08/05/2021 | | ###### Transition Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS 817 _Transition-Annex_V1_23 04 2020.pdf) | 23/04/2020 | | | Other (GS 817 _Transition-Annex_V2 15 06 2020.pdf) | 15/06/2020 | |