Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS10878 Markdown Content: #### GS10878 - ALUMINUM RECYCLING – A SOLUTION FOR CO2 EMISSION REDUCTION BY AS METAL, ROMANIA” ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Annual Report ANRE 2020 pg 126.pdf) | 31/01/2024 | | | Required (SDG-Impact-tool_AS METAL_year2020_11.09.2023.xlsx) | 11/01/2024 | | | Required (PDD_AS Metal_v4_11.10.2023_clean.pdf) | 11/01/2024 | | | Required (Validation report_16.12.2023_AS Metal_clean.pdf) | 11/01/2024 | | | Other (LSC Report_Stakeholder Consultation Report_AS Metal_07.01.2023.pdf) | 26/01/2023 | | | Required (SDG13_1 ER Calculation_AS Metal_year2020_11.09.2023.xlsx) | 11/01/2024 | | | Other (25 June 2023_AS Metals_T-VVB_V.1.0-Audit-Techniques.xlsx) | 07/07/2023 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (2023 AS Metal Aluminum Recycling CO2 Saving Project_Annual Report_19.12.2024.pdf) | 19/12/2024 | | | Other (SDG-Impact-tool_AS METAL_monitoring period 14.02.2022-13.02.2024_29.04.2024.xlsx) | 08/07/2024 | | | Required (FVR_GS_VER_REP_AS METAL_24BGCE227_Rev 3.1Aa_28112024.pdf) | 02/12/2024 | | | Required (Monitoring-Report_AS METAL_MP1_01.05.2022-13.02.2024_v2.2_04.11.2024_Clean.pdf) | 02/12/2024 | | | Required (SDG13_ ER Calculation_AS Metal_monitoring period 01.05.2022-13.02.2024_04.11.2024.xlsx) | 02/12/2024 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (2023 AS Metal Aluminum Recycling CO2 Saving Project_Annual Report_19.12.2024.pdf) | 23/12/2024 | | ###### Annual Report no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (2024 AS Metal Aluminium Recycling CO2 Saving Project_Annual Report_22.12.2025.pdf) | 12/01/2026 | | ###### Performance Certification | Project no. 2 ##### Stakeholder Consultation 20/03/2026 - 03/04/2026 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Monitoring parameter no.6_SDG13_ ER Calculation_AS Metal_monitoring period 14.02.2024-31.12.2025_11.02.2026.xlsx) | 11/03/2026 | | | Supporting (SDG-Impact-tool_AS METAL_monitoring period 14.02.2024-31.12.2025_11.02.2026.xlsx) | 11/03/2026 | | | Required (FVR_GS_FVER_REP_AS METAL_2025BGCE1303_Rev 1.1Aa_04032026.pdf) | 11/03/2026 | | | Required (Monitoring-Report_AS METAL_MP1.1_14.02.2024-31.12.2025_11.02.2026 .pdf) | 11/03/2026 | |