Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS3606 Markdown Content: #### GS3606 - ASYV 8.5MW Solar PV Project (CPA-001) ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Monitoring Report_2nd monitoring period_01-03-2017 to 31-08-2018_v1.pdf) | 12/11/2020 | | | Other (Verification Report_2nd monitoring period_01-03-2017 to 31-08-2018_v2.pdf) | 12/11/2020 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Validation Report_20-10-2016.pdf) | 12/11/2020 | | | Other (2019_01_GS3606_Transition-Annex_GwG_CPA_Ver_3.pdf) | 07/05/2019 | | | Required (GS Passport_14-10-2016.pdf) | 12/11/2020 | | | Other (GWG_LSC_REPORT-_revision_2(clean).pdf) | 07/05/2019 | | | Required (PDD_08-10-2015.pdf) | 12/11/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Monitoring Report_1st monitoring period_23-10-2015 to 25-02-2017_v03.pdf) | 12/11/2020 | | | Required (Verification Report_1st monitoring period_23-10-2015 to 25-02-2017_v05.pdf) | 12/11/2020 | | | Required (Monitoring Report_1st monitoring period_23-10-2015 to 25-02-2017_v05.pdf) | 12/11/2020 | | | Required (Verification Report_1st monitoring period_23-10-2015 to 25-02-2017_v04.pdf) | 12/11/2020 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (2021 08 18 GWG GS MR 3rd Issuance v4.0_final.pdf) | 07/03/2022 | | | Required ((1)2021 03 04 GwG CDM PoA ER v5.0.xlsx) | 15/09/2021 | | | Required (Final FVerR-GS PoA10202-22-12-2021(1).pdf) | 07/03/2022 | | | Required ((1)FVR_Gigawatt PoA 10202_v2.0_clean.pdf) | 15/09/2021 | | | Other (2021 08 18 GWG GS MR 3rd Issuance v3.0.pdf) | 18/10/2021 | | | Required ((1)10202_PoA MR v5.0_clean.pdf) | 15/09/2021 | |