Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS1291 Markdown Content: #### GS1291 - Balsas Renewable Energy Project ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS1291 Local Stakeholder Consultation Report_04.07.2013_v2.pdf) | 31/07/2020 | | | Other (Monitoring Report_1st monitoring period_01.12.2011 to 01.09.2014_v5.docx) | 31/07/2020 | | | Required (PDD 21.01.2014_v12.pdf) | 31/07/2020 | | | Other ((1)Verification Report_1st monitoring period_01.12.2011 to 30.09.2014_v3.pdf) | 31/07/2020 | | | Other (PDD 10.08.2012_v1.pdf) | 31/07/2020 | | | Other (PDD 10.09.2013_v9.pdf) | 31/07/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)Monitoring Report_1st monitoring period_01.12.2011 to 01.09.2014_v5.docx) | 31/07/2020 | | | Other (Verification Report_1st monitoring period_01.12.2011 to 30.09.2014_v1.pdf) | 31/07/2020 | | | Other (GS1291 Issuance Review Period_1st MP_16.03.2015.pdf) | 31/07/2020 | | | Required ((2)Verification Report_1st monitoring period_01.12.2011 to 30.09.2014_v3.pdf) | 31/07/2020 | | | Other ((1)Monitoring Report_1st monitoring period_01.12.2011 to 01.09.2014_v3.pdf) | 31/07/2020 | | | Other (GS1291 Issuance Review Period_1st MP_11.05.2015.doc) | 31/07/2020 | |