Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS4236 Markdown Content: #### GS4236 - African Biogas Carbon Programme (ABC) - Uganda - VPA003 ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (DEV_237 Deviation Request (2).pdf) | 05/09/2024 | | | Required (PDD_21.02.2017_v2.3.pdf) | 03/10/2021 | | | Other (GS Passport_11.05.2015_v1.pdf) | 03/10/2021 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (VAL_REP_VPA003_ABC_170303_v2.pdf) | 07/12/2020 | | | Other (Validation Report_03.03.2017_v2.pdf) | 03/10/2021 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)Verification Report_1st monitoring period_19.04.2015 to 31.08.2017_v3.pdf) | 03/10/2021 | | | Other ((1)Monitoring Report_1st monitoring period_19.04.2015 to 31.08.2017_v3.pdf) | 03/10/2021 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Verification Report_2nd monitoring period_01.09.2017 to 31.03.2019_v1.pdf) | 03/10/2021 | | | Other (Monitoring Report_2nd monitoring period_01.09.2017 to 31.03.2019_v1.3.docx) | 03/10/2021 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Verification Report_3rd monitoring period_19.04.2015 to 31.08.2017_v1.pdf) | 03/10/2021 | | | Other (Monitoring Report_3rd monitoring period_19.05.2019 to 30.04.2020_V1.4.pdf) | 03/10/2021 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (24nov21 BSUL VPA03 MR MPIV V1.3 .docx) | 29/11/2021 | | | Other (21-043 VPA03 Uganda MP4 GS4236 FVR 2021-11-25 clean.pdf) | 29/11/2021 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (13May24 VPA03 CPII SDG database v2.1_with SDG impact tool.xlsx) | 06/06/2024 | | | Required (13May24 VPA03 CPII SDG database v2.1(1).xlsx) | 06/06/2024 | | | Required (GS4236-VPA03 DCR FValR_05-08-2024_rev1.0_c.pdf) | 05/08/2024 | | | Required (05Aug24 GS4236 ABC_CPII_VPA03DD_v2.6.docx) | 05/08/2024 | | ###### Performance Review no. 5 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (CCIPL 1359 VPA 03 FVR clean.pdf) | 28/11/2022 | | | Other (T-PerfCert V2-Project-Annual-Report-Form-VPA3.pdf) | 13/12/2022 | | | Required (CCIPL 1359 VPA 03 FVR clean(2).pdf) | 10/03/2023 | | | Required (03FEB23_BSUL_VPA03_MR_MPV_V1.7.docx) | 10/03/2023 | | ###### Performance Review no. 6 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (T-PerfCert_v3.0-Project-Annual-Report_02122024_VPA003.pdf) | 11/12/2024 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (T-PerfCert_v3.0-Project-Annual-Report_02122024_VPA003.pdf) | 20/12/2024 | | ###### Performance Certification | Real or Regular VPAs no. 1 ##### Stakeholder Consultation 22/07/2025 - 05/08/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (06FEB2626 VPA03 CPII SDG database MPI v1.6_clean.xlsx) | 20/02/2026 | | | Required (06FEB26 PA03_CPII MRI V2.4 clean.pdf) | 20/02/2026 | | | Required (GS 2747 Verification report V3.4 19022026_Clean.pdf) | 20/02/2026 | | | Supporting (430_V1.3_IQ_SDG-Impact-tool_VPA03_v1.5.xlsx) | 20/02/2026 | | ###### Annual Report no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (T-PerfCert_v3.0-Project-Annual-Report_22122025_VPA003.docx) | 22/12/2025 | |