Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS7526 Published Time: Wed, 11 Feb 2026 08:48:26 GMT Markdown Content: #### GS7526 - BMT Solar Farm ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (BMT_PDD_V6_2020.02.11_Clean.pdf) | 12/02/2020 | | | Other (SCR_BIM Solar Farm_V2_2019.08.09_Clean.pdf) | 28/08/2019 | | | Other (Validation Report - BMT Solar Farm - Rev 1.2 11022020.pdf) | 12/02/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Monitoring Report_BMT Solar Farm_V04_clean(1).pdf) | 19/07/2022 | | | Other (1st Annual Report_May 19 - Mar 20_BMT Solar farm_V1.pdf) | 28/04/2020 | | | Other (BMT_Solar_Ver_report_rev(2).pdf) | 19/07/2022 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Annual Report_BMT Solar Farm_V2 - 20220826 Signed.pdf) | 31/08/2022 | | | Required (ER_BMT Solar Solar_May2021-Feb2023.xlsx) | 22/07/2023 | | | Other (CCIPL 1883 GS7526 FVR 16102023 CC.pdf) | 16/10/2023 | | | Other (MR2_BMT Solar_Ver4_2023.09.11_clean.pdf) | 16/10/2023 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (CCIPL 2018_ GS 7526_RCP _FVR(1).pdf) | 30/05/2024 | | | Required (SDG-Impact-tool_BMT Solar_2024.05.30.xlsx) | 30/05/2024 | | | Required (BMT_PDD_V8_2024.05.15(1).docx) | 30/05/2024 | | | Required (ER_BMT_2024.03.26(1).xlsx) | 30/05/2024 | | ###### Performance Certification | Project no. 2 ##### Stakeholder Consultation 09/01/2025 - 23/01/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (20250224 BMT Solar_ Monitoring-Report v2 (Clean version).pdf) | 23/04/2025 | | | Required (20250224_ER_BMT Solar_Mar'23 to Apr'24.xlsx) | 23/04/2025 | | | Required (CCIPL 2386 GS7526 FVR_Clean.pdf) | 23/04/2025 | | ###### Annual Report no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (T-PerfCert_v3.0-Project-Annual-Report_GS7526.pdf) | 08/01/2025 | |