Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS702 Markdown Content: #### GS702 - Boreas-1 Enez Wind Power Plant ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (PDD 17.07.2013_v8.pdf) | 11/03/2020 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS Validation Report_31.05.2019_v3.pdf) | 11/03/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((2)Verification Report_1st monitoring period_05.01.2011 to 07.31.2013_v5.pdf) | 11/09/2021 | | | Other ((2)Monitoring Report_1st monitoring period_01.05.2011 to 31.07.2013_v5.pdf) | 11/09/2021 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)Monitoring Report_2nd monitoring period_12.11.2015 to 24.04.2018_v6.pdf) | 11/09/2021 | | | Other ((1)Verification Report_2nd monitoring period_12.11.2015 to 24.04.2018_v2.1.pdf) | 11/09/2021 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (OSF 740 Boreas wind to PP2019-2021 ER Calculations_v5_24.02.2022.xlsx) | 08/03/2022 | | | Other (T-V4.0-Deviation-Request-Form _v2_Boreas_final.pdf) | 11/01/2022 | | | Other (Monitoring-Report_BoreasEnezI_v5_24.02.2022.pdf) | 08/03/2022 | | | Other (Final_Ver Report_740 Boreas wind_Sandeep Kanda_v02.1_27-02-2022.doc) | 08/03/2022 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Final_ER calculations_530 Boreas wind_v04_30-05-2019.xls) | 06/01/2021 | | | Other (Emission Reduction Calculation Excel File (PDD_Boreas Enez I WPP_v13_wtc_25.06.2019.pdf).pdf) | 06/01/2021 | | | Other (GS4GG Verification Report (PDD_Boreas Enez I WPP_v13_wotc_25.06.2019.pdf).pdf) | 06/01/2021 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Verification Report_v03_GS 702 Boreas-1 Enez Wind_Öykü Yakupoğlu_06-12-2024_clean.pdf) | 09/12/2024 | | | Other (T-V4.0-Deviation-Request-Form _Boreeas_24.03.2022_FINAL.pdf) | 09/04/2022 | | | Other (Annual Report_Boreas.pdf) | 27/01/2022 | | | Other (MR_Boreas_WPP_v5_05.12.2024.pdf) | 09/12/2024 | | | Other (Annual Report_Boreas 2019.pdf) | 07/04/2022 | | | Required (ER_Calculations_Boreas_WPP_v01_09_08_2024.xlsx) | 10/10/2024 | | ###### Design Certification Renewal | Project no. 1 ##### Stakeholder Consultation 07/05/2025 - 21/05/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (30Jun_ER calculations_BOREAS_WPP_REVISED_CC11 (1)_010725-1047333.xlsx) | 08/07/2025 | | | Required (GS.VAL.25.017_Boreas -1 WPP_Final Validation Report_V3.0_10.07.2025_CL.pdf) | 16/07/2025 | | | Required (30Jun_BoreasWPP_PDD_Revised_final_Clean.pdf) | 08/07/2025 | |