Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS2290 Markdown Content: #### GS2290 - Buenos Aires Renewable Energy Project ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (LSC Report_Buenos Aires Renewable Energy Project_v4.0.pdf) | 21/08/2024 | | | Other (T-V4.0-Deviation-Request-Form_BuenosAires_GS2290_GSdecision(1).pdf) | 02/09/2024 | | | Other (GS2290 Validation Report_13.11.2017_v1.pdf) | 13/01/2021 | | | Other ((1)GS Passport 18.11.2013_v5.pdf) | 13/01/2021 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Transition Annex_27.11.2014.pdf) | 02/10/2021 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((2)Monitoring Report_1st monitoring period_01.03.2012 to 31.08.2017_v1.pdf) | 13/01/2021 | | | Other ((1)Verification Report_1st monitoring period_01.03.2012 to 31.08.2017_v1.pdf) | 13/01/2021 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((2)Monitoring Report_2nd monitoring period_01.03.2012 to 31.08.2017_v6.pdf) | 13/01/2021 | | | Required ((1)Verification Report_2nd monitoring period_01.03.2012 to 31.08.2017_v2.pdf) | 13/01/2021 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (MR_Buenos Aires_period 2_01 09 2017_31 12 2019_v.06.2.pdf) | 20/09/2021 | | | Other (GS.VER.19.168.FVeR_Cleaned_Approved.pdf) | 20/09/2021 | | | Other (T-V4.0-Deviation-Request-Form_BuenosAires_GS2290_GSdecision.pdf) | 01/04/2021 | |