Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS917 Markdown Content: #### GS917 - Cakirlar Run-off-River Hydro Power Plant ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (PDD_04-05-2010.pdf) | 22/09/2020 | | | Other (GS917 Validation Report 16.07.2014_v2.pdf) | 25/03/2020 | | | Other ((1)GS Passport_07.30.2010.pdf) | 25/03/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)Monitoring Report_1st monitoring period_03.01.2013 to 05.31.2016_v9.pdf) | 25/03/2020 | | | Other ((1)Verification Report_1st monitoring period_03.01.2013 to 05.31.2016_v4.pdf) | 25/03/2020 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (ER calculations_Cakirlar HPP_v04_31.10.2022.xlsx) | 20/02/2023 | | | Other (PDD_Cakirlar HPP_v5_18.01.2023.pdf) | 20/02/2023 | | | Other (GS_RCP REPORT_2021XTMD14 Cakirlar HEPP_Rev 3.0Aa_11022023 (1).pdf) | 20/02/2023 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (ER_Calculations_Çakırlar_HPP_v03_16_02_2025.xlsx) | 21/02/2025 | | | Other (MR_Cakirlar_HPP_v04_16_02_2025_ik_clean.pdf) | 21/02/2025 | | | Other (Cakirlar_HPP-Project-Annual-Report.pdf) | 22/12/2023 | | | Other (FVR_GS_VER_REP_Çakırlar HEPP_21XTMD13_Rev 3.0Aa_18022025.pdf) | 21/02/2025 | | | Other (430_V1.3_IQ_SDG-Impact-tool_v1_Cakirlar HPP.xlsx) | 23/12/2024 | | ###### Annual Report no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Cakirlar-HPP-Annual-Report_v2.pdf) | 07/01/2025 | | ###### Annual Report no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Cakirlar_HPP_Annual_Report.pdf) | 30/12/2025 | |