Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS1173 Markdown Content: #### GS1173 - CAMLICA II HEPP ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (PDD 08.07.2015_v9.pdf) | 17/06/2020 | | | Required (GS1173 Validation Report_16.04.2015_v1.4Aa.pdf) | 17/06/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)Verification Report_1st monitoring period_01.01.2015 to 28.02.2017_v2.pdf) | 17/06/2020 | | | Required ((1)Monitoring Report_1st monitoring period_01.01.2015 to 28.02.2017_v6.pdf) | 17/06/2020 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Monitoring Report_2nd monitoring period_01-03-2017 to 31-05-2019_v07.pdf) | 07/10/2020 | | | Other ((1)Verification Report_2nd monitoring period_01-03-2017 to 31-05-2019_v06.pdf) | 07/10/2020 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (CCIPL 1009 FVR_Clean(2).pdf) | 17/03/2023 | | | Other (CAMLICA-II-HEPP-T-PerfCert_V1.1-Monitoring-Report-22.02.2023-v05-cc.pdf) | 17/03/2023 | | | Other (Final_ER Calculations_541 Camlica hydro_v04_28-01-2020.xls) | 02/03/2020 | | | Other (GS1173-T-PerfCert_V2.0-Project-Annual-Report-Form-CAMLICA II HEPP.pdf) | 29/12/2022 | | | Other (T-V5.0-Deviation-Request-Form Camlica 1173 - MP_SC_FINAL.pdf) | 22/12/2022 | | ###### Transition Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Other Document 14 (Transition-Annex_Camlica HEPP_03022020_R3_Track change_GTE.docx).docx) | 02/03/2020 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (CAMLICA-II-HEPP-T-PreReview_V1.2-PDD_v15_04.01.2023-cc.pdf) | 16/01/2023 | | | Other (ER_Calculation_Sheet_CAMLICA-II-HEPP_v02_31052022(1).xlsx) | 09/11/2022 | | | Other (CCIPL 1009_FVR.clean.pdf) | 16/01/2023 | | ###### Performance Review no. 6 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS1173-T-PerfCert_V2.0-Project-Annual-Report-Form-CAMLICA II HEPP_25.12.2023.pdf) | 28/12/2023 | | | Other (CAMLICA II HEPP_T PerfCrt_V.1.1_Monitoring Report_06.11.2024_CC.pdf) | 20/11/2024 | | | Required (ER_Calculation Sheet_Camlıca 2 _05.04.2024.xlsx) | 25/04/2024 | | | Other (FVR_GS_VER_REP Çamlıca II HEPP_24TQC10_Rev 2.0Aa_11112024.pdf) | 20/11/2024 | | | Other (ER_Calculation Sheet_Camlıca 2 _06.11.2024.xlsx) | 20/11/2024 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS1173-T-PerfCert_V3.0-Project-Annual-Report-Form-CAMLICA II HEPP_30.12.2024_signed.pdf) | 30/12/2024 | | ###### Annual Report no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS1173-T-PerfCert_V3.0-Project-Annual-Report-Form-CAMLICA II HEPP_v.2_26.12.2025.pdf) | 26/12/2025 | |