Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS906 Markdown Content: #### GS906 - Canakkale WPP ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS Passport.pdf) | 18/08/2019 | | | Required (GS906 Local Stakeholder Consultation Report 16.08.2010.pdf) | 24/03/2020 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS906 Emission Reductions Calculations.xls) | 24/03/2020 | | | Required (GS906 Validation Report_05.06.2012_rev9.pdf) | 24/03/2020 | | | Required (PDD_04-07-2012.doc) | 22/09/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Verification Report_1st monitoring period_11.02.2011 to 31.08.2012_v1.3.pdf) | 24/03/2020 | | | Other (Monitoring Report_1st monitoring period_11.02.2011 to 31.08.2012_v3.pdf) | 24/03/2020 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Monitoring Report_2nd monitoring period_01.09.2012 to 30.09.2013_v2.pdf) | 24/03/2020 | | | Other (Verification Report_2nd monitoring period_01.09.2012 to 30.09.2013_v1.1.pdf) | 24/03/2020 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Verification Report_3rd monitoring period_01.10.2013 to 31.03.2015_v1.pdf) | 24/03/2020 | | | Other (Monitoring Report_3rd monitoring period_01.10.2013 to 31.03.2015_v3.pdf) | 24/03/2020 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Verification Report_4th monitoring period_01.04.2015 to 31.03.2016_v2.pdf) | 24/03/2020 | | | Other (Monitoring Report_4th monitoring period_01.04.2015 to 31.03.2016_v5.pdf) | 24/03/2020 | | ###### Performance Review no. 5 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Verification Report_5th monitoring period_01-04-2016 to 10-02-2018_v3(1).pdf) | 11/09/2024 | | | Required (Monitoring Report_5th monitoring period_01-04-2016 to 10-02-2018_v4(1).doc) | 11/09/2024 | | ###### Performance Review no. 6 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Canakkale_WPP-Project-Annual-Report.pdf) | 22/12/2023 | | | Other (Final_ER Calculations_654 Canakkale Wind_v07_13-05-2024.xlsx) | 21/05/2024 | | | Other (Final_MR_654 Canakkale Wind_v8_05.07.2024.pdf) | 29/07/2024 | | | Other (Final_Ver Report_654 Canakkale Wind_İrem Taşkıran_v05_24-07-2024_tc.pdf) | 29/07/2024 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Final_ER calculations_657 Canakkale wind_v03_20-01-2021.xls) | 01/02/2021 | | | Other (Final_Val Report_657 Canakkale wind_Seda Atabek_v02_14-06-2021.pdf) | 16/06/2021 | | | Other (PDD-Canakkale WPP_v4_12.08.2021_06.09.2021.pdf) | 10/09/2021 | | | Other (Annual Report 2021_Çanakkale_WPP.pdf) | 26/12/2022 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Canakkale-WPP-Annual-Report.pdf) | 08/01/2025 | | ###### Design Certification Renewal | Project no. 1 ##### Stakeholder Consultation 15/02/2025 - 28/02/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (FVR_GS_RCP REPORT_2025TQMD24_Çanakkale WPP_Rev 2.0Aa_21042025.pdf) | 24/04/2025 | | | Required (ER calculations_Canakkale_WPP_v03_19_04_2025.xls) | 24/04/2025 | | | Supporting (SDG Impact Tool_Canakkale_ Wind_v01_30.01.2025.xlsx) | 04/02/2025 | | | Required (PDD_Canakkale WPP_v03_clean_30_01_2025.pdf) | 13/08/2025 | | ###### Annual Report no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Canakkale_WPP_Annual_Report.pdf) | 26/12/2025 | |