Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS1235 Markdown Content: #### GS1235 - CANTA WPP ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Supporting (GS1235 Local Stakeholder Consultation Report_16.04.2012.pdf) | 14/07/2020 | | | Other (DEV_346.pdf) | 24/10/2024 | | | Other (GS Passport 09.06.2014_v5.pdf) | 14/07/2020 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS1235 IRR Calculations_v5.xlsx) | 14/07/2020 | | | Required (GS1235 Validation Report_06.07.2015_v5.pdf) | 14/07/2020 | | | Required ((1)PDD 01.08.2019_v7.pdf) | 14/07/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)Verification Report_1st monitoring period_01.10.2014 to 31.10.2016_v1.3Aa.pdf) | 14/07/2020 | | | Required ((1)Monitoring Report_1st monitoring period_02.02.2015 to 31.10.2016_v5.pdf) | 14/07/2020 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (T-PerfCert_V2.0-Project-Annual-Report-Form_2021_CANTA.pdf) | 29/12/2022 | | | Other (Final_Ver Report_613 Canta wind_Anıl Söyler_v02.2_22-01-2025.pdf) | 22/01/2025 | | | Other (Final_MR_613 Canta wind_v09_20.01.2025_CC.pdf) | 22/01/2025 | | | Required (Final_MR_613 Canta wind_v07_03-06-2024_CC.pdf) | 14/06/2024 | | | Other (T-V5.0-Deviation-Request-Form for GS Projects_09112022 - Canta WPP_SC.pdf) | 26/12/2022 | | | Other (GS1235-T-PerfCert_V2.0-Project-Annual-Report-Form-CANTA WPP_25.12.2023.pdf) | 28/12/2023 | | | Other (Deviation-Request-Form-v2.1.pdf) | 28/08/2020 | | | Other (Final_ER Calculations_613 Canta wind_v07_28.10.2024.xlsx) | 09/12/2024 | | | Required (Final_Ver Report_613 Canta wind_Anıl Söyler_v02_13-06-2024.pdf) | 14/06/2024 | | | Other (430_V1.3_IQ_SDG-Impact-tool_CANTA WWP(1).xlsx) | 22/01/2025 | | | Required (Final_ER Calculations_613 Canta wind_v07_03-06-2024.xlsx) | 14/06/2024 | | ###### Transition Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Transition Annex_CANTA WPP_01.05.2020_cc.pdf) | 01/05/2020 | | ###### Design Change Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (PDD_09-07-2020.docx) | 09/10/2020 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (T-PreReview_V1.2-Project-Design-Document-CANTA WPP-20052023_cc.pdf) | 22/05/2023 | | | Required (Final_ER calculations_694 Canta wind_v03_05-12-2022.xlsx) | 04/01/2023 | | | Required (Final_Val Report_694 Canta wind_Seda Atabek_v04-20-05-2023.docx) | 22/05/2023 | | | Required (Final_SDG Impact Tool_694 Canta wind_v01_06-10-2022.xlsx) | 04/01/2023 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS1235-T-PerfCert_V3.0-Project-Annual-Report-Form-CANTA WPP_30.12.2024.pdf) | 30/12/2024 | | ###### Performance Certification | Project no. 1 ##### Stakeholder Consultation 24/11/2025 - 08/12/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS1235_ER-Calculations_Canta-WPP_24122025.xlsx) | 22/01/2026 | | | Supporting (430_V1.3_IQ_SDG-Impact-tool Canta WPP.xlsx) | 22/01/2026 | | | Required (GS-1235_Canta_WPP_2ndCP-1stVer_2026_cc .pdf) | 09/02/2026 | | | Required (Final_Verification Report_1249 Çanta Wind_Beyda Altuntaş_v05_07-02-2026_clean.pdf) | 07/02/2026 | | ###### Annual Report no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS1235-T-PerfCert_v3.0-Project-Annual-Report 2024.pdf) | 23/12/2025 | |