Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS574 Markdown Content: #### GS574 - Cataltepe 16MW Wind Farm Project, Turkey ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (PDD_23-09-10.pdf) | 28/07/2019 | | | Other (Monitoring Report_1st monitoring period_19-04-11 to 31-07-12_v1.2.pdf) | 28/07/2019 | | | Other (Verification Report_1st monitoring period_19-04-11 to 31-07-12_v1.1.pdf) | 28/07/2019 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (PDD 23.09.2010_v9.pdf) | 05/03/2020 | | | Other (PDD 13.09.2010_v8.pdf) | 05/03/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Monitoring Report_1st monitoring period_19.04.2011 to 31.07.2012_v1.2.pdf) | 05/03/2020 | | | Required (Verification Report_1st monitoring period_19.04.2011 to 31.07.2012_v1.1.pdf) | 05/03/2020 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Final_Ver Report_1051 Cataltepe Wind-VER_Khalid Mahmood_v04_23-07-2024_clean.pdf) | 23/07/2024 | | | Other (Final_MR_1051 Cataltepe Wind-VER_v03_27-05-2024_wotc.pdf) | 04/07/2024 | | | Required (Final_ER calculations_1051 Cataltepe Wind-VER_v0.2_16-04-2024.xlsx) | 29/04/2024 | | | Other (Final_SDG Impact Tool_1051 Cataltepe Wind-VER_v02_27-05-2024.xlsx) | 04/07/2024 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Baseline ER calculations_Cataltepe Wind_v03.xlsx) | 31/03/2023 | | | Required (Final_ER calculations_878 Cataltepe Wind_v02_05-01-2023.xlsx) | 20/01/2023 | | | Other (SDG Impact Tool_Cataltepe Wind_v03.xlsx) | 31/03/2023 | | | Other (Çataltepe 16 Wind Farm Project PDD_v06_wotc(2).pdf) | 30/06/2023 | | | Required (Final_Val Report_878 Cataltepe Wind_Seda Atabek_v06_wotc(2).pdf) | 30/06/2023 | | ###### Design Certification Renewal | Project no. 1 ##### Stakeholder Consultation 07/02/2025 - 21/02/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Baseline Study_Cataltepe WPP_v0.2.xlsx) | 12/03/2025 | | | Required (Çataltepe 16 Wind Farm Project PDD_v04_wotc.docx) | 16/07/2025 | | | Supporting (430_V1.3_IQ_SDG-Impact-tool_Cataltepe WPP_v0.3_final.xlsx) | 01/09/2025 | | | Required (FVR_GS_RCP REPORT_2024TQCE365_Çataltepe WPP_Rev 4.0Aa_03062025.pdf) | 06/06/2025 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (T-PerfCert_v3.0-Project-Annual-Report_Cataltepe WPP_2024.pdf) | 12/11/2025 | |