Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS949 Markdown Content: #### GS949 - Clean and Efficient Cooking and Heating Project, China ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS949 Local Stakeholder Consultation Report.pdf) | 30/03/2020 | | | Other (Verification Report_1st monitoring period_01-03-09 to 30-09-10_v1.0.pdf) | 20/08/2019 | | | Other (Verification Report_4th monitoring period_01-03-13 to 28-02-15_v5.0.pdf) | 20/08/2019 | | | Other (GS Passport_26-04-11.pdf) | 20/08/2019 | | | Other (Monitoring Report_2nd monitoring period_01-10-10 to 15-05-12_v8.0.pdf) | 20/08/2019 | | | Other (Monitoring Report_4th monitoring period_01-03-13 to 28-02-15_v7.0.pdf) | 20/08/2019 | | | Required (PDD_24-04-12.pdf) | 20/08/2019 | | | Other (Monitoring Report_3rd monitoring period_16-05-12 to 28-02-13_v6.0.pdf) | 20/08/2019 | | | Other (Verification Report_2nd monitoring period_01-10-10 to 15-05-12_v4.0.pdf) | 20/08/2019 | | | Other (Monitoring Report_1st monitoring period_01-03-09 to 30-09-10_v4.0.pdf) | 20/08/2019 | | | Other (Verification Report_3rd monitoring period_16-05-12 to 28-02-13_v3.0.pdf) | 20/08/2019 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS949 Local Stakeholder Consultation Report_Hubei_v3.pdf) | 30/03/2020 | | | Other (GS949 Local Stakeholder Consultation Report (2).pdf) | 30/03/2020 | | | Other (GS949 Local Stakeholder Consultation Report_Guizhou_13.08.2012.pdf) | 30/03/2020 | | | Other ((1)GS949 Local Stakeholder Consultation Report.pdf) | 30/03/2020 | | | Other (GS949 Local Stakeholder Consultation Report_13.08.2012.pdf) | 30/03/2020 | | | Other (GS949 Local Stakeholder Consultation Report_Guizhou_v3.pdf) | 30/03/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)Verification Report_1st monitoring period_01-03-09 to 30-09-10_v1.0.pdf) | 30/03/2020 | | | Other ((1)Monitoring Report_1st monitoring period_01-03-09 to 30-09-10_v4.0.pdf) | 30/03/2020 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)Verification Report_2nd monitoring period_01-10-10 to 15-05-12_v4.0.pdf) | 30/03/2020 | | | Other ((1)Monitoring Report_2nd monitoring period_01-10-10 to 15-05-12_v8.0.pdf) | 30/03/2020 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)Verification Report_3rd monitoring period_16-05-12 to 28-02-13_v3.0.pdf) | 30/03/2020 | | | Other ((1)Monitoring Report_3rd monitoring period_16-05-12 to 28-02-13_v6.0.pdf) | 30/03/2020 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)Verification Report_4th monitoring period_01-03-13 to 28-02-15_v5.0.pdf) | 30/03/2020 | | | Other ((1)Monitoring Report_4th monitoring period_01-03-13 to 28-02-15_v7.0.pdf) | 30/03/2020 | |