Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS1020 Published Time: Wed, 11 Feb 2026 08:48:26 GMT Markdown Content: #### GS1020 - Production and dissemination of Ceramic Water Purifiers by Hydrologic, in the Kingdom of Cambodia ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS Passport_01.15.2018_v3.docx) | 23/05/2019 | | | Required (PDD_02.05.2018_v11.2.docx) | 23/05/2019 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS1020 Validation Report 29.11.2017_v1.pdf) | 22/04/2020 | | | Other ((3)GS1020 Transition Annex_29.10.2019_Final.docx) | 06/10/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)Monitoring Report_1st monitoring period_01.12.2010 to 31.05.2012_v4.pdf) | 22/04/2020 | | | Other (Verification Report_1st monitoring peeriod_01.12.2010 to 31.05.2012_v1.1.pdf) | 22/04/2020 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)Monitoring Report_2nd monitoring period_01.06.2012 to 30.04.2013_v1.pdf) | 22/04/2020 | | | Other ((1)Verification Report_2nd monitoring period_01.06.2012 to 30.04.2013_v2.pdf) | 22/04/2020 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)Monitoring Report_3rd monitoring period_01.05.2013 to 30.04.2014_v3.pdf) | 12/09/2021 | | | Other ((1)Verification Report_3rd monitoring period_01.05.2013 to 30.04.2014_rev2.pdf) | 12/09/2021 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Verification Report_4th monitoring period_01.05.2014 to 30.04.2015_v2.pdf) | 06/10/2020 | | | Required (Monitoring Report_4th monitoring period_01.05.2014 to 30.04.2015_v5.pdf) | 06/10/2020 | | ###### Performance Review no. 5 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)Monitoring Report_5th monitoring period_01.05.2015 to 30.04.2016_v2.doc) | 12/09/2021 | | | Other ((1)Verification Report_5th monitoring period_01.05.2015 to 30.04.2016_rev2.pdf) | 12/09/2021 | | ###### Performance Review no. 6 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Monitoring Report_6th monitoring period_01.05.2016 to 30.04.2017_v2.pdf) | 06/10/2020 | | | Other ((1)Verification Report_6th monitoring period_01.05.2016 to 30.04.2017_rev1.pdf) | 12/09/2021 | | ###### Performance Review no. 7 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Verification Report_7th monitoring period_01.05.2017 to 30.11.2017_v4.pdf) | 06/10/2020 | | ###### Performance Review no. 10 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (HSE_CP2-MP3_GS1020MR_V5.0_20210707(clean).pdf) | 07/07/2021 | | | Other (HSE_CP2-MP3_ER_Cal_V3.0_20210612.xlsx) | 19/06/2021 | | | Other (FVerR_Cambodia CWP_GSver 3rd_CP2_V3.0.pdf) | 07/07/2021 | | ###### Performance Review no. 11 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (FVerR_Cambodia CWP_GSver 4th_CP2_V02-clean(1).pdf) | 11/10/2022 | | | Required (HSE_CP2-MP4_GS1020ER_V3.0_20220516.xlsx) | 23/05/2022 | | | Required (HSE_CP2-MP4_GS1020MR_V3.0_20220516.docx) | 23/05/2022 | | | Required (FVerR_Cambodia CWP_GSver 4th_CP2.pdf) | 23/05/2022 | | ###### Performance Review no. 12 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (20230611_GS4GG Final VER Report_Cambodia CWP 5th in CP2_clean.pdf) | 12/06/2023 | | | Required (HSE_CP2-MP5_GS1020ER_V1.0_20230327.xlsx) | 14/05/2023 | | | Required (20230508_GS4GG Final VER Report_Cambodia CWP 5th in CP2.pdf) | 14/05/2023 | | | Required (HSE_CP2-MP5_GS1020MR_V3.0_20230610(clean).pdf) | 12/06/2023 | | | Required (HSE_CP2-MP5_GS1020MR_V2.0_20230424.pdf) | 14/05/2023 | | ###### Performance Review no. 13 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (CCIPL2225_FVR_CC_14-11-2024.pdf) | 15/11/2024 | | | Required (HSE_CP2-MP6_GS1020ER_V3.0_20241007.xlsx) | 23/10/2024 | | | Required (HSE_CP2-MP6_GS1020MR_V2.4_20240621.docx) | 27/06/2024 | | | Required (CCIPL2225_FVR_Finaldocx.pdf) | 27/06/2024 | | | Required (HSE_CP2-MP6_GS1020MR_V3.0_20241007_Clean.pdf) | 23/10/2024 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Validation Report - Renewal of CP Hydrologic Cambodia (GS1020)-2024 Clean.pdf) | 10/07/2025 | | | Required (HSE_CP3_ER_PDD_GS1020_20240520.xlsx) | 20/11/2024 | | | Required (HSE_CP3_PDD(Renewal)_V12.3_GS1020_R2_30062025_Cleaned.pdf) | 10/07/2025 | | | Required (HSE_CP3_ER_PDD_GS1020_R2_30062025.xlsx) | 10/07/2025 | | | Required (HSE_CP3_SDG-Impact-tool_GS1020_R1_300125.xlsx) | 12/03/2025 | | ###### Performance Certification | Project no. 1 ##### Stakeholder Consultation 23/07/2025 - 06/08/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (HSE_CP2-MP7_GS1020MR_V2.0_20250616-f.pdf) | 16/07/2025 | | | Required (HSE_CP2-MP7_GS1020ER_V2.0_20250616-f.xlsx) | 16/07/2025 | | | Required (20250623_GS4GG Final VER Report_HSE CWP MP7CP2-f.pdf) | 16/07/2025 | |