Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS6566 Markdown Content: #### GS6566 - Corum Solar Power Plant Project ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (PDD_21.01.2019_v5.pdf) | 05/11/2021 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Validation Report_20.11.2018_v3.pdf) | 05/11/2021 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Monitoring Report_1st monitoring period_19.12.2017 to 31.07.2019_v3.pdf) | 05/11/2021 | | | Other (Corum SPP Annual Report of 2020.pdf) | 18/06/2022 | | | Other (Corum SPP Annual Report of 2019.pdf) | 18/06/2022 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (T-V4.0-Deviation-Request-Form_Corum SPP_SC_FINAL.pdf) | 18/06/2022 | | | Required (Final_ER calculations_849 Corum Solar_v01_01-03-2022.xlsx) | 21/04/2022 | | | Other (Final_Ver Report_849 Corum Solar_Seda Atabek_v04_06-08-2022(1).pdf) | 05/09/2022 | | | Other (2nd Monitoring report of Corum Solar Power Plant Project_v0.3_wotc(1).pdf) | 05/09/2022 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Final_Ver Report_1092 Corum solar_Seda Atabek_v05_20-10-2023_clean(1).pdf) | 01/12/2023 | | | Required (3rd Monitoring report of Corum Solar Power Plant Project_v0.4_wotc(1).pdf) | 01/12/2023 | | | Required (Final_ER calculations_1092 Corum Solar_v02_18-08-2023.xlsx) | 31/08/2023 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (4th Monitoring report of Corum Solar Power Plant Project_v01.xlsx) | 17/05/2024 | | | Other (Stakeholder Participant List of Second LSC Meeting.pdf) | 15/10/2024 | | | Other (Corum SDG Impact Tool_v0.1_4th MR.xlsx) | 25/07/2024 | | | Other (4th Monitoring report of Corum Solar Power Plant Project_v04_wotc.pdf) | 25/07/2024 | | | Other (GS_VER_REP Çorum Solar Power Plant_24TQC143_Rev 4.0Aa_14102024.pdf) | 15/10/2024 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Final_PDD_933 Corum Solar_v0.3.pdf) | 23/11/2022 | | | Required (Final_Val Report_933 Corum solar_v02_23-11-2022.pdf) | 23/11/2022 | | | Required (Final_ER calculations_933 Corum Solar_v0.3.xlsx) | 23/11/2022 | | | Required (Final_SDG Impact Tool_933 Corum Solar_v0.2.xlsx) | 23/11/2022 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (T-PerfCert_v3.0-Project-Annual-Report_Corum SPP_2024.pdf) | 03/12/2025 | |