Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS775 Published Time: Wed, 11 Feb 2026 08:48:26 GMT Markdown Content: #### GS775 - CYY Biopower Wastewater treatment plant including biogas reuse for thermal oil replacement and electricity generation Project, Thailand (300059)_pre-CDM VER ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (PDD_09-03-09.pdf) | 03/08/2019 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)Verification Report_monitoring period_25-05-2008 to 24-03-2009_v1.1.pdf) | 28/02/2020 | | | Required ((1)Monitoring Report_monitoring period_25-05-2008 to 24-03-2009_v1.4.pdf) | 28/02/2020 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)Monitoring Report_1st monitoring period_25-05-08 to 24-03-09_v1.5.pdf) | 28/02/2020 | | | Required ((1)Verification Report_1st monitoring period_25-05-08 to 24-03-09_v2.0.pdf) | 28/02/2020 | |