Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS10790 Markdown Content: #### GS10790 - GS10789 VPA1: Efficient and Clean Cooking for households in Somalia ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (BURN_VPA1_Somalia_Stakeholder-Consultation-Report.pdf) | 01/07/2020 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (VPA-Design-Document_BURN10790_v4.0_clean.pdf) | 16/10/2021 | | | Other (BURN GS PoA_VPA 1_Somalia_ER calculation including baseline and project KPT results_v.2.4.xlsx) | 16/10/2021 | | | Other (CCIPL 873 VPA 01 FVR-16.10.2021-Clean.pdf) | 16/10/2021 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (BURN GS PoA_VPA 1_Somalia_ER calculation 1st verification_v.4.0.xlsx) | 10/02/2022 | | | Other (20220203_GS10790 Monitoring-Report MP1_v4.0_clean.pdf) | 10/02/2022 | | | Other (CCIPL 873 FVR- GS verification_Clean.pdf) | 10/02/2022 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (30AUG2022 GS10790 MPII Monitoring-Report v2.2_Clean.pdf) | 26/09/2022 | | | Required (30AUG2022 POA10789_VPA001_ER cal.xlsx) | 01/09/2022 | | | Required (CCIPL 1238 FVR 23092022 clean.pdf) | 26/09/2022 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (25JULY2023 GS10790 MPIII Monitoring-Report v5.0 CL.pdf) | 28/07/2023 | | | Required (25JULY20232023_POA10789_VPA01_ERcal_V2.0_PUBLIC VERSION.xlsx) | 25/08/2023 | | | Other (GS 10790_Deviation form_Total Sales Record.pdf) | 30/06/2023 | | | Required (CCIPL1710 FVR 28072023_CL.pdf) | 28/07/2023 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (NON-CONFIDENTIAL 20JUN2024 Som VPA 01_Ex Post ER.xlsx) | 05/09/2024 | | | Other (DEV_604.pdf) | 09/01/2024 | | | Other (GS10790 Project-Annual-Report-Form-VPA 01.pdf) | 21/12/2023 | | | Other (DEV_777.pdf) | 14/08/2024 | | | Required (04SEPT2024_GS10790_VPA 01_Somalia_MR CL.pdf) | 05/09/2024 | | | Required (GS10790_FVR_v4.0_clean.pdf) | 05/09/2024 | | | Other (DEV_651.pdf) | 05/04/2024 | | ###### Performance Certification | Real or Regular VPAs no. 1 ##### Stakeholder Consultation 22/04/2025 - 06/05/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS10790_FVR_MP5_v3.1_clean.pdf) | 14/08/2025 | | | Required (08AUG2025_GS10790_VPA 01_Somalia_MP05_MR_cl.pdf) | 14/08/2025 | | | Required (08AUG2025 Ex Post ER calculations SOM VPA 001 MP5 (NON-CONFIDENTIAL).xlsx) | 14/08/2025 | | ###### Design Certification Renewal | Real Case VPA no. 1 ##### Stakeholder Consultation 25/04/2025 - 09/05/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Supporting (25FEB2025_SDG-Impact-tool_Som VPA 001.xlsx) | 23/04/2025 | | | Supporting (28MAR2025-POA-Design-Document-GS10789.pdf) | 23/04/2025 | | | Required (GS10790_FVR_RCP_v3.1_TC_.pdf) | 12/08/2025 | | | Supporting (GS10790 VPA01 Somalia_Local Stakeholder Consultation Report_final.pdf) | 23/04/2025 | | | Required (13FEB2025_GS10789_VPA 01_Somalia_CP2_Ex Ante ER calculations (CONFIDENTIAL)_080725.xlsx) | 08/07/2025 | | | Required (05AUG2025_GS10789_VPA 01_Somalia_Design-Document_CL.pdf) | 12/08/2025 | | ###### Design Change | With VVB no. 1 ##### Stakeholder Consultation 13/10/2025 - 27/10/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Supporting (18AUG2025_GS10790_VPA 01_Somalia_MP05_MR_CL.pdf) | 15/09/2025 | | | Supporting (GS10790_FVR_MP5_v3.2_clean.pdf) | 13/10/2025 | | | Required (12NOV2025 Ex_ante ER calculations SOM VPA1 (NON_CONFIDENTIAL).xlsx) | 14/11/2025 | | | Supporting (12NOV2025_VPA 01 Somalia_VPA DD_clean.pdf) | 14/11/2025 | | | Required (FValR_ Design Change Validation Report_GS 10790_clean.pdf) | 14/11/2025 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (27 NOV 2025_GS10790 Project Annual_Report_Form_VPA_01 - Signed.pdf) | 15/12/2025 | |