Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS5642 Markdown Content: #### GS5642 - Burn Stoves Project in Kenya ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS Passport_02.09.2018_v3.pdf) | 08/06/2019 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (103000000107416_Validation_Report_-_RCP_(CCIPL495_-_clean).pdf) | 26/05/2020 | | | Required (Jikokoa_Project_Renewal_ER_180322.xlsx) | 30/08/2021 | | | Other (Transition_Annex-GS_5642_181004_tracked.pdf) | 26/05/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS 5642_Monitoring Report_New_190916 Last MP CP 1(1).pdf) | 18/07/2023 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS 5642_Monitoring Report_New-190612 CPII MP I(1).pdf) | 18/07/2023 | | ###### Design Change Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (CCIPL 1024-Assessment of design change_Burn Stoves Project in Kenya Ver. 3.0 (Track).pdf) | 04/01/2022 | | | Required (20211230_Jikokoa_Project_Renewal_ER calculation.xlsx) | 04/01/2022 | | | Other (20211230_Burn Stoves Project in Kenya_Transition-PDD_track.pdf) | 04/01/2022 | | | Required (T-v1.1-Design-Change-Memo_GS5642_clean.pdf) | 22/11/2021 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS 5642_Monitoring Report_210301-clean (1).pdf) | 18/07/2023 | | | Required (CCIPL860 GS FVR -VKS-01032021-Clean(1).pdf) | 18/07/2023 | | | Other (29JULY2022 T-V5.0-Deviation-Request-Form_GS5642_FINAL.pdf) | 02/09/2022 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (25AUG2022_GS 5642 Monitoring Report (1).pdf) | 18/07/2023 | | | Required (CCIPL1067 GS FVR v.6_clean(1).pdf) | 18/07/2023 | | ###### Performance Review no. 5 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (CCIPL1709_GS5642_FVR_V1.1 - Clean.pdf) | 14/11/2023 | | | Required (NON-CONFIDENTIAL_1NOV2023_ GS5642 Ex Post ER calculations v4.0.xlsx) | 22/11/2023 | | | Required (09NOV2023 GS 5642 Monitoring Report MP 4 v 4.0 CL.pdf) | 22/11/2023 | | ###### Design Change Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (CCIPL 1441 design change FVR version 05.0 12062023_TC(1).pdf) | 14/06/2023 | | | Required (09JUNE2023_Jikokoa_Project_Renewal_ER calculation.xlsx) | 14/06/2023 | | | Required (09JUNE2023_V4.8-Project-Design-Document- BURN 5642 transition_TC.pdf) | 14/06/2023 | | | Required (09JUNE2023_GS 5642_Design-Change-Memo_TC.pdf) | 14/06/2023 | | | Required (09JUNE2023_V4.8-Project-Design-Document- BURN 5642 transition_CL.pdf) | 14/06/2023 | | | Required (CCIPL 1441 design change FVR version 05.0 12062023_CC.pdf) | 14/06/2023 | | ###### Performance Review no. 6 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS5642_JIKOKOA Monitoring Report MP5_v1.4_CL(1).pdf) | 06/01/2025 | | | Required (NON-CONFIDENTIAL 20th DEC GS5642 Kenya Ex Post ER calculations MPVCP2 (1).xlsx) | 06/01/2025 | | | Required (FVR GS5642_MP5CP2_v1.2_TC(1).pdf) | 06/01/2025 | | ###### Design Certification Renewal | Project no. 1 ##### Stakeholder Consultation 21/02/2025 - 07/03/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (NON-CONFIDENTIAL30AMAY2025 GS5642_ Ex Ante ER Calculations_v1.7.xlsx) | 05/06/2025 | | | Required (FVR_GS5642_RCP_Burn Stoves Project in Kenya (BELL_GS_RCP_1224)_Clean 2.pdf) | 25/06/2025 | | | Required (30May2025_5642-Project-Design Document_Clean.pdf) | 05/06/2025 | | ###### Performance Certification | Real or Regular VPAs no. 1 ##### Stakeholder Consultation 14/08/2025 - 28/08/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (FVR GS5642_MP6CP2_v1.1_CL.pdf) | 16/10/2025 | | | Required (MR_GS5642_MP6CP2_v1.3_CL.pdf) | 16/10/2025 | | | Required (GS5642 Kenya Ex Post ER calculations MP6CP2.xlsx) | 16/10/2025 | | ###### Performance Certification | Project no. 1 ##### Stakeholder Consultation 30/11/2025 - 12/12/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Supporting (430_V1.3_IQ_SDG-Impact-tool GS 5642_Final.xlsx) | 28/11/2025 | | | Required (GS5642_JIKOKOA Monitoring Report CP3_MPI_v1.1.pdf) | 28/11/2025 | | | Required (26AUGUST2025 Kenya POA 5642_Ex Post ER Calculations CP3 MPI_Final.xlsx) | 28/11/2025 | | | Required (VKU.F27W.Verification_Report_VKU.VER.60.25_GS_5642.pdf) | 28/11/2025 | |