Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS879 Markdown Content: #### GS879 - Energy Efficient Cook Stoves for Siaya Communities, Kenya ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (111010_GS_Passport_Tembea_V01.pdf) | 03/03/2023 | | | Required (GS879 Local Stakeholder Consultation Review 30.06.2010_v1.pdf) | 20/03/2020 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS Validation Report 04.12.2017_v1.pdf) | 20/03/2020 | | | Other (GS4GG Transition Annex 03.07.2012.docx) | 20/03/2020 | | | Required (PDD 07.03.2018_v3.2.5.docx) | 19/11/2021 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)Monitoring Report_1st monitoring period_01.01.2011 to 02.07.2012_v4.1.pdf) | 21/03/2020 | | | Required (2013-02-20 GS Final Verification Report_Siaya.pdf) | 03/03/2023 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)Verification Report_2nd monitoring period_03.07.2012 to 31.12.2013_rev1.2.pdf) | 21/03/2020 | | | Other ((1)Monitoring Report_2nd monitoring period_07.03.2012 to 12.31.2013_v4.pdf) | 21/03/2020 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Verification Report_3rd monitoring period_01-01-2018 to 31-12-2018_v4.pdf) | 03/03/2023 | | | Other (Monitoring Report_3rd monitoring period_01-01-2018 to 31-12-2018_v4.docx) | 22/09/2020 | | | Other (191031_Tembea_Cook Stove _ER Spreadsheet_xlsx.xlsx) | 04/11/2019 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)Monitoring Report_4th monitoring period_01.01.2015 to 31.12.2015_v1.pdf) | 21/03/2020 | | | Other ((1)Verification Report_4th monitoring period_01.01.2015 to 31.12.2015_v1.1.pdf) | 21/03/2020 | | ###### Performance Review no. 5 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)Verification Report_5th monitoring period_01.01.2016 to 31.12.2016_v1.2.pdf) | 21/03/2020 | | | Other ((1)Monitoring Report_5th monitoring period_01.01.2016 to 31.12.2016_v3.pdf) | 21/03/2020 | | ###### Performance Review no. 6 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)Verification Report_6th monitoring period_01.01.2017 to 31.12.2017_v1.1.pdf) | 21/03/2020 | | | Other ((1)Monitoring Report_6th monitoring period_01.01.2017 to 31.12.2017_v3.docx) | 21/03/2020 | | ###### Performance Review no. 7 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (190806_Tembea_Monitoring_Report_V04_clean(1).docx) | 03/03/2023 | | | Required (191031_Tembea_Cook Stove _ER Spreadsheet_xlsx(1).xlsx) | 03/03/2023 | | | Required (7. Verification report(1).pdf) | 03/03/2023 | | ###### Performance Review no. 8 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Verification Report_8th monitoring period_01-01-2019 to 31-12-2019_v12.pdf) | 22/09/2020 | | | Other (Monitoring Report_8th monitoring period_01-01-2019 to 31-12-2019_v43.pdf) | 22/09/2020 | | ###### Performance Review no. 9 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (211027_Tembea_Cook Stove _ER Spreadsheet_V03.xlsx) | 31/10/2021 | | | Other (VR_Clean.pdf) | 16/12/2021 | | | Other (211208_Tembea_Monitoring_Report_ver05.pdf) | 19/01/2022 | | ###### Performance Review no. 10 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (220118_Tembea_Monitoring_Report_ver01.2_cc.pdf) | 10/02/2023 | | | Other (220127_Tembea_Cook Stove _ER Spreadsheet_V01.2(2).xlsx) | 29/11/2022 | | | Other (GS 879_Annual report.pdf) | 30/12/2022 | | | Other (GS 879-Project-Design-Document_cc.pdf) | 10/02/2023 | | | Other (Verification Report Tembea 2022 Revised Nov 2022.pdf) | 29/11/2022 | | ###### Performance Review no. 11 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS879_Tembea_Monitoring_Report_ver1.4_CC.docx) | 10/08/2023 | | | Other (GS.VER.22.59_FVR-Clean .pdf) | 10/08/2023 | | | Other (GS 879_Tembea_Cook Stove _ER Spreadsheet_V01.2 ER.xlsx) | 10/08/2023 | | ###### Performance Review no. 12 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS879_Tembea_Monitoring_Report_ver1.3-CC.pdf) | 23/09/2024 | | | Other (GS879_FVR_v1.3_clean.pdf) | 30/09/2024 | | | Required (GS 879_Tembea_Cook Stove _ER_V01.0(1).xlsx) | 07/08/2024 | | ###### Design Certification Renewal | Project no. 1 ##### Stakeholder Consultation 25/11/2025 - 09/12/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Supporting (GS879 - SDG-Impact-tool_20-02-2026.xlsx) | 20/02/2026 | | | Required (GS 879 _3CP_exante _Tembea_Cook Stove _ER Spreadsheet_V1.0_20-02-2026.xlsx) | 20/02/2026 | | | Required (GS879_Project-Design-Document_CC.pdf) | 20/02/2026 | | | Required (FVR_GS.VAL.24.114_20260220_Non-Confidential_Public_clean.pdf) | 20/02/2026 | | ###### Performance Certification | Project no. 1 ##### Stakeholder Consultation 23/12/2025 - 06/01/2026 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS.VER.25.024_GS879_FVR _Public_CF.pdf) | 20/02/2026 | | | Required (GS879_7MP_Monitoring_Report_ver1.3_CF.pdf) | 20/02/2026 | | | Supporting (GS+879_7MP_SDG-Impact-tool_11032026.xlsx) | 11/03/2026 | | | Required (GS+879_7MP_ER_V02.xlsx) | 20/02/2026 | |