Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS710 Markdown Content: #### GS710 - Federal Intertrade Haiyuan Solar Cooker Project ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS Passport_10-05-13.pdf) | 02/08/2019 | | | Supporting (PDD_08-12-12.pdf) | 02/08/2019 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)Monitoring Report_1st monitoring period_15-09-10 to 31-08-12_v3.1.pdf) | 28/02/2020 | | | Required ((1)Verification Report_1st monitoring period_15-09-10 to 31-08-12_v1.2.pdf) | 28/02/2020 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)Monitoring Report_2nd monitoring period_01-09-12 to 31-08-13_v3.0.pdf) | 28/02/2020 | | | Required ((1)Verification Report_2nd monitoring period_01-09-12 to 31-08-13_v1.2.pdf) | 28/02/2020 | |