Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS375 Markdown Content: #### GS375 - *Fujian Zhangpu Liuao 45MW Wind Power Project ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Monitoring Report_1st monitoring period_21-01-08 to 27-05-08_v4.0.pdf) | 07/09/2020 | | | Supporting (PDD_12-11-07.pdf) | 14/07/2019 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)Verification Report_2nd monitoring period_28-05-08 to 27-05-09_v1.0.pdf) | 25/02/2020 | | | Required (Monitoring Report_2nd monitoring period_28-05-08 to 27-05-09_v2.0.pdf) | 07/09/2020 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)Monitoring Report_4th monitoring period_28-05-10 to 27-05-11_v2.0.pdf) | 25/02/2020 | | | Required (Verification Report_4th monitoring period_28-05-10 to 27-05-11_v2.1.pdf) | 07/09/2020 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)Monitoring Report_5th monitoring period_28-05-11 to 27-05-12_v5.0.pdf) | 25/02/2020 | | | Required ((1)Verification Report_5th monitoring period_28-05-11 to 27-05-12_v2.0.pdf) | 25/02/2020 | |