Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS5340 Markdown Content: #### GS5340 - GS1247 VPA 100 Improved Kitchen Regimes Multi-Country PoA - Kasungu Boreholes, Malawi ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (PDD_18.10.2017_v3.pdf) | 24/06/2021 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)Monitoring Report_1st monitoring period_11.02.2016 to 31.12.2017_v2.pdf) | 24/06/2021 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Monitoring Report_2nd monitoring period_01.01.2018 to 31.12.2018_v1.pdf) | 24/06/2021 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Monitoring Report_3rd monitoring period_01.01.2019 to 31.12.2019_v4.pdf) | 24/06/2021 | | ###### Performance Review no. 5 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Malawi Phase 2_ER Calcs_v2(3).xlsx) | 21/02/2023 | | | Required (GS1247_(GS3105-08;3560-61)_Final Verification_Report_Guide_V02_25012023.pdf) | 21/02/2023 | | | Required (GS5329-32_GS5335-44 GS5437-41_P2_MR_MP5_v5_CLEAN(1).pdf) | 21/02/2023 | | ###### Performance Review no. 6 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS5329-44_GS5437-41_Malawi_P2_AR_2023_v1(16).pdf) | 18/12/2023 | | | Required (Malawi Phase 2_ER Calcs_v4(15).xlsx) | 30/04/2024 | | | Required (GS5329-32_GS5335-44 GS5437-41_P2_MR_MP6_MP1_v3_CLEAN(17).pdf) | 30/04/2024 | | | Required (Verification Report_GS5329-32_GS5335-41_GS5437-41_MP3(14).pdf) | 30/04/2024 | |