Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS6041 Markdown Content: #### GS6041 - GS1247 VPA 129 Zoba Anseba Community Safe Water ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS6041 VPA-DD_06.03.18_v2.pdf) | 01/05/2021 | | ###### Internal Verification no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)GS5951-55_GS6041-42_MR_MP3-MP1_v6 CLEAN.pdf) | 16/09/2021 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS5951-55_GS6041-42_Anseba-BHs Annual-Report 2022(5).pdf) | 20/12/2022 | | ###### Internal Verification no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Final-Verification-Report-GS5951-55-MP5-GS6041-42-MP3-POA-GS1247(1).pdf) | 31/07/2023 | | | Required (GS5951-55_GS6041-42_MR_MP5-MP3_v2_CLEAN(3).pdf) | 31/07/2023 | | | Required (GS5951-55 6041-42_ERs_calcs_v2(3).xlsx) | 31/07/2023 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS5951-55_GS6041-42_MR_MP5-MP3_v2_CLEAN(9).pdf) | 01/08/2023 | | | Required (GS5951-55 6041-42_ERs_calcs_v2(9).xlsx) | 01/08/2023 | | | Required (Final-Verification-Report-GS5951-55-MP5-GS6041-42-MP3-POA-GS1247(7).pdf) | 01/08/2023 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS1247_FVR Clean_Improved Kitchen Regimes_07 10 2024(12).pdf) | 10/10/2024 | | | Other (GS5951-55_GS6041-42_MR_MP6-MP4_v5_CLEAN(11).pdf) | 10/10/2024 | | | Other (GS5951-55_GS6041-42_Anseba-BHs Annual-Report 2023 (1)(5).pdf) | 18/12/2023 | | | Required (GS5951-55 6041-42_ERs_calcs_v4(9).xlsx) | 19/08/2024 | | ###### Performance Certification | Real or Regular VPAs no. 1 ##### Stakeholder Consultation 18/04/2025 - 02/05/2025 No Public Documents Found ###### Annual Report no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Project-Annual-Report-GS6041-42_Anseba-BHs-2025 Signed.pdf) | 19/12/2025 | |