Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS6350 Markdown Content: #### GS6350 - GS1247 VPA 140 Lango Safe Water Project ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (PDD_16.01.2019_v6.pdf) | 04/07/2021 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)Monitoring Report_1st monitoring period_21.09.2018 to 31.03.2019_v2.pdf) | 04/07/2021 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Monitoring Report_2nd monitoring period_21.09.2019 to 31.03.2020_v5.pdf) | 04/07/2021 | | ###### Performance Review no. 6 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Lango Project_MR_MP6 V8 CLEAN(18).pdf) | 29/06/2023 | | | Other (Lango Uganda - T-PerfCert_V2.0-Project-Annual-Report-Form - Dec 2022 v2(18).pdf) | 29/06/2023 | | | Other (Lango Uganda - T-PerfCert_V2.0-Project-Annual-Report-Form - Dec 2022(13).pdf) | 15/12/2022 | | | Required (Lango Safe Water Project_ERs_MP6 (SWS caps applied) V4(13).xlsx) | 06/02/2023 | | | Required (GS 1247_Lango Safe water Project_Revised FVR_GS review_Resubmission_Clean versi(6).pdf) | 17/07/2023 | | ###### Performance Review no. 7 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Lango Uganda - T-PerfCert_V2.0-Project-Annual-Report-Form_2023(17).pdf) | 14/12/2023 | | | Required (Lango Project_MR_MP7 V4 CLEAN(20).pdf) | 23/02/2024 | | | Required (Lango Safe Water Project_ERs_MP7 (SWS caps applied) V4(20).xlsx) | 23/02/2024 | | | Required (Final-Verification-Report-GS5106-GS5186-GS5197-GS6349-GS6351-GS7362-GS7366-MP7-Lango-Project v.2.doc(23).pdf) | 23/02/2024 | | ###### Performance Review no. 8 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Final_Ver Report_1205 Lango Safe Water_Report_Sanjay Kumar_v09_17032025R2 CLEAN(1).docx) | 19/03/2025 | | | Required (Lango Project_MR_MP8 V5 CLEAN(1).docx) | 21/02/2025 | | | Required (Lango Safe Water Project_ERs_MP8 V3(1).xlsx) | 21/02/2025 | | ###### Design Change Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Lango_Ex_Ante_calcs_Oct_2023_v2(6).xlsx) | 11/01/2024 | | | Required (Lango_Safe_Water_Project_VPA-DD_v2(6).pdf) | 11/01/2024 | | ###### Design Certification Renewal | Regular Case VPA no. 2 ##### Stakeholder Consultation 14/05/2025 - 28/05/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Lango Safe Water Project CPR VPA-DD v7 (GS6350-51) CLEAN.pdf) | 02/09/2025 | | | Required (GS6351 Ex-Antes v4.xlsx) | 22/07/2025 | | | Supporting (GS(6349-51) Validation Report_v3_Clean.pdf) | 22/07/2025 | | ###### Annual Report no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Lango+Safe+Water+Project+-+T-PerfCert_v3-Project-Annual-Report+2025+v2_Signed.pdf) | 23/12/2025 | |