Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS5329 Markdown Content: #### GS5329 - GS1247 VPA 91 Improved Kitchen Regimes Multi-Country PoA - Dowa & Kasungu Boreholes, Malawi ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (PDD_18.10.2017_v3.pdf) | 19/06/2021 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)Monitoring Report_1st monitoring period_19.12.2015 to 31.12.2017_v2.pdf) | 19/06/2021 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)Monitoring Report_2nd monitoring period_01.01.2018 to 31.12.2018_v2.pdf) | 19/06/2021 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)Monitoring Report_3rd monitoring period_01-01-2019 to 31-12-2019_v4.pdf) | 19/06/2021 | | ###### Internal Verification no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)GS5329-32, GS5335-44, GS5437-41_P2_MR_MP4_CAPPED_v6_CLEAN.pdf) | 23/08/2021 | | | Other ((1)Malawi Phase 2_ER Cals_v4 CAPPED.xlsx) | 23/08/2021 | | ###### Performance Review no. 5 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Malawi Phase 2_ER Calcs_v2(3).xlsx) | 21/02/2023 | | | Required (GS1247_(GS3105-08;3560-61)_Final Verification_Report_Guide_V02_25012023.pdf) | 21/02/2023 | | | Required (GS5329-32_GS5335-44 GS5437-41_P2_MR_MP5_v5_CLEAN(1).pdf) | 21/02/2023 | | ###### Performance Review no. 6 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS5329-32_GS5335-44 GS5437-41_P2_MR_MP6_MP1_v3_CLEAN(3).pdf) | 29/04/2024 | | | Other (GS5329-44_GS5437-41_Malawi_P2_AR_2023_v1.pdf) | 18/12/2023 | | | Required (Malawi Phase 2_ER Calcs_v4(1).xlsx) | 29/04/2024 | | | Required (Verification Report_GS5329-32_GS5335-41_GS5437-41_MP3.pdf) | 29/04/2024 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Supporting (GS5329-5332_5335-7_VPA-DD_CP2_v6_CLEAN.pdf) | 29/11/2023 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS5329-44_Malawi_P2_AR_2024_v1_signed.pdf) | 12/12/2024 | | ###### Performance Certification | Real or Regular VPAs no. 1 ##### Stakeholder Consultation 04/08/2025 - 18/08/2025 No Public Documents Found