Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS10779 Markdown Content: #### GS10779 - GS1340 Efficient cookstoves in Burkina Faso - VPA-15 - Improved Cookstove F3PA project in Nahouri ###### Internal Validation no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (101.1-OR-POA-T-GS4GG_VPA-DD_PoA GS1340 - VPA-15 - F3PA Nahouri _20210212 v7.0_clean.pdf) | 16/02/2021 | | | Other (GENDER BASELINE REPORT_V2.pdf) | 29/07/2021 | | ###### Internal Verification no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (T-PerfCert_V1.1- GS1340-VPA 14-15-16-17-MR_MP1_v3.0_clean.pdf) | 27/09/2021 | | | Required (GS 1340 - VPA 14-15-16-17-ER_MP1_v1.0.xlsx) | 25/06/2021 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (T-PerfCert_V1.1- GS1340-VPA 14-15-16-17_MP2-VPA 29_MP1-MR_v3.0_clean(4).pdf) | 12/10/2023 | | | Other (T-PerfCert_V2.0-Project-Annual-Report-Form_GS1340-tiipaalga-Vintage 2021 (1)(4).docx) | 09/12/2022 | | | Required (CCIPL1777_FVR_v1.1_27092023_Clean(4).pdf) | 12/10/2023 | | | Required (GS 1340 - VPA 14-15-16-17_MP2- VPA 29_MP1-ER_v1.0(5).xlsx) | 08/08/2023 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Verification-Report_GS11074 GS10778-81 -PoA_GS1340-Burkina-Faso(1).pdf) | 06/07/2024 | | | Required (GS 1340 - VPA 14-15-16-17_MP3- VPA 29_MP2-ER_v2.0(8).xlsx) | 06/07/2024 | | | Required (T-PerfCert_V1.1- GS1340-VPA 14-15-16-17_MP3-VPA 29_MP2-MR_v5.0_clean(7).pdf) | 06/07/2024 | | ###### Performance Certification | Real or Regular VPAs no. 1 ##### Stakeholder Consultation 22/07/2025 - 05/08/2025 No Public Documents Found