Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS10797 Markdown Content: #### GS10797 - Himalayan Rocket Stove Project in India ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (HRS-01.07.2020 Final.pdf) | 02/07/2020 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Validation report-Clean 10797.pdf) | 03/02/2023 | | | Required (ER Sheet_June_2021.xlsx) | 15/06/2021 | | | Other (HRS_PDD_Ver06_01022023 clean.pdf) | 03/02/2023 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (DEV_772.pdf) | 29/07/2024 | | | Other (HRS ER_Ver05_13.03.2025.xlsx) | 27/03/2025 | | | Other (FVR_ GS 10797_MP1_v3.2_CL.pdf) | 27/03/2025 | | | Other (HRS MR_Ver05.1_19.02.25_Clean.pdf) | 20/02/2025 | | | Other (Project Annual Report Form_ GS GS ID- 10797_HRS .pdf) | 08/11/2023 | | ###### Design Certification Renewal | Project no. 1 ##### Stakeholder Consultation 05/02/2025 - 19/02/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Supporting (GS 10797_IQ_SDG-Impact-tool_30.12.24.xlsx) | 31/12/2024 | | | Required (10797_RCP2_ER VER-04_10.04.25.xlsx) | 15/04/2025 | | | Required (GS 10797_RCP Validation report_CP2_GSR2_clean.pdf) | 21/05/2025 | | | Required (GS 10797_HRS_PDD_Ver10.1_13.05.25_clean.pdf) | 21/05/2025 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (302722_52891_contract_3.pdf) | 18/12/2024 | | ###### Performance Certification | Project no. 1 ##### Stakeholder Consultation 08/09/2025 - 22/09/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (10797_MP_2_CP_1_ER_Ver02.2_27.10.2025.xlsx) | 04/11/2025 | | | Required (GS10797_FVR_EPL2454_Round1_Clean.pdf) | 04/11/2025 | | | Required (10797 MP_2_CP_1_MR v_2.2_27.10.2025_clean.pdf) | 04/11/2025 | | ###### Annual Report no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (302722_56247_contract_2.pdf) | 30/01/2026 | |