Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS1174 Published Time: Wed, 11 Feb 2026 08:48:26 GMT Markdown Content: #### GS1174 - Indonesia Domestic Biogas Programme of Activities (IDBP) , VPA-1 ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (T-V4.0-Deviation-Request-VVB team GS1174 (1 October 2021) -clean final.pdf) | 03/09/2024 | | | Other (PDD_28.05.2018_v7.doc) | 02/10/2021 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS1174 Validation Report_03.07.2018_v1.pdf) | 28/06/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)Monitoring Report_1st monitoring period_01.06.2011 to 31.05.2013_v5.docx) | 28/06/2020 | | | Required ((1)Verification Report_1st monitoring period_01.06.2011 to 31.05.2013_v1.4.pdf) | 28/06/2020 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)Monitoring Report_2nd monitoring period_01.06.2013 to 31.12.2014_v1.3.pdf) | 28/06/2020 | | | Required ((1)Verification Report_2nd monitoring period_01.06.2013 to 31.12.2014_v1.pdf) | 28/06/2020 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)Monitoring Report_3rd monitoring period_01.01.2015 to 31.12.2015_v1.3.pdf) | 02/10/2021 | | | Other ((1)Verification Report_3rd monitoring period_01.01.2015 to 31.12.2015_v1.pdf) | 02/10/2021 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Monitoring Report_4th monitoring period_01.01.2016 to 31.12.2016_v4.pdf) | 28/06/2020 | | | Other (Monitoring Report_4th monitoring period_01.01.2016 to 31.12.2016_v5.pdf) | 28/06/2020 | | ###### Performance Review no. 5 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)Monitoring Report_5th monitoring period_01.01.2017 to 31.12.2017_v4.docx) | 28/06/2020 | | | Required ((1)Verification Report_5th monitoring period_01.01.2017 to 31.12.2017_v1.2.pdf) | 28/06/2020 | | ###### Performance Review no. 6 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Verification Report_6th monitoring period_01.06.2018 to 31.12.2018_v1.2.pdf) | 02/10/2021 | | ###### Performance Review no. 7 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Monitoring Report_7th monitoring period_01.01.2019 to 31.12.2019_v1.5.pdf) | 02/10/2021 | | ###### Performance Review no. 8 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (21-012_FVerR.pdf) | 17/08/2021 | | | Required (20210712 VPA1 MR v1.3.pdf) | 17/08/2021 | | | Required (20210712 ER Calculation VPA1 MP4 CP1_v03.XLS) | 17/08/2021 | | ###### Performance Review no. 9 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (VR_VPA1 GS1174_v03 clean version.pdf) | 11/11/2022 | | | Other (20221101 VPA1 MR v05_clean.docx) | 11/11/2022 | | | Required (20220217 ER Calculation VPA1 MP4 CP2_v03.xlsx) | 04/07/2022 | | ###### Performance Review no. 10 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (VR_VPA1 GS1174_v04 clean(1).pdf) | 27/12/2023 | | | Required (20230320 ER Calculation VPA1 MP5 CP2(1).xlsx) | 02/10/2023 | | | Required (MR_VPA1_v.03_clean(1).pdf) | 27/12/2023 | | ###### Performance Certification | Real or Regular VPAs no. 1 ##### Stakeholder Consultation 06/06/2025 - 20/06/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (VR_VPA1 GS1174_2023_v1.2.pdf) | 31/07/2025 | | | Required (20250304_VPA1 MR v4.0__clean.pdf) | 31/07/2025 | | | Required (20240930 ER Calculation VPA1 MP6 CP2__.xlsx) | 04/06/2025 | | ###### Design Certification Renewal | Real Case VPA no. 1 ##### Stakeholder Consultation 24/11/2025 - 08/12/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS1174_RCP PoA&VPA1_V3.1_Clean.pdf) | 09/04/2026 | | | Required (VPA 1 ER calculation CP renewal_fNRB changed.xlsx) | 19/01/2026 | | | Supporting (430_V1.3_IQ_SDG-Impact-tool.xlsx) | 19/01/2026 | | | Required (20260407 VPA 1 - CP Renewal_PDD_v2.4_clean.pdf) | 09/04/2026 | | | Required (20241127 IDBP_PoA-DD_v.0.5_clean.pdf) | 07/11/2025 | | ###### Annual Report no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (TM_T-PerfCert_v3.0-Project-Annual-Report_IDBP_GS1174_GS5303_2024.pdf) | 16/02/2026 | |