Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS1172 Markdown Content: #### GS1172 - Indonesia Domestic Biogas Programme of Activities (IDBP) ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS Passport_07-07-2013.pdf) | 20/06/2019 | | | Required (PDD_21-10-2013.pdf) | 20/06/2019 | | ###### Design Change Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (PDD_11-06-2020.docx) | 05/10/2020 | | ###### Design Change | With VVB no. 1 ##### Stakeholder Consultation 19/01/2025 - 31/01/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Supporting (430_V1.1_IQ_SDG-Impact-tool.xlsx) | 02/01/2025 | | | Required (Validation Report IDBP PoA-DD_Yayasan_28112024.pdf) | 07/01/2025 | | | Supporting (20241127 IDBP_PoA-DD_v.0.5_clean.pdf) | 16/06/2025 | | | Required (20230829 ER Calculation VPA2 CP renewal v.0.2.xlsx) | 02/01/2025 | | ###### Design Certification Renewal | PoA with Real Case VPA no. 1 ##### Stakeholder Consultation 24/11/2025 - 08/12/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (20260407 VPA 1 - CP Renewal_PDD_v2.4_clean.pdf) | 09/04/2026 | | | Required (20260317 IDBP_PoA-DD_v.1.2_clean.pdf) | 18/03/2026 | | | Supporting (430_V1.3_IQ_SDG-Impact-tool.xlsx) | 19/01/2026 | | | Required (VPA 1 ER calculation CP renewal_fNRB changed.xlsx) | 19/01/2026 | | | Required (GS1174_RCP PoA&VPA1_V3.1_Clean.pdf) | 09/04/2026 | |