Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS613 Markdown Content: #### GS613 - Integrated Biomass Energy Conservation Project - Malawi ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Monitoring Report_4th monitoring period_02.10.2012 to 01.10.2013_v5.pdf) | 25/01/2020 | | | Other (Verification Report_4th monitoring period_10.02.2012 to 10.01.2013.pdf) | 25/01/2020 | | | Other (Monitoring Report_1st monitoring period_24.11.2008 to 10.01.2010.pdf) | 25/01/2020 | | | Other (Verification Report_2nd monitoring period_10.02.2010 to 10.01.2011_v1.pdf) | 25/01/2020 | | | Other (GS Passport_01-07-09.pdf) | 30/07/2019 | | | Other (Verification Report_1st monitoring period_24.11.2008 to 10.01.2010.pdf) | 25/01/2020 | | | Other (Monitoring Report_3rd monitoring period_10.02.2011 to 10.01.2012_v5.pdf) | 25/01/2020 | | | Other (Verification Report_3rd monitoring period_10.02.2011 to 10.01.2012.pdf) | 25/01/2020 | | | Other (Monitoring Report_2nd monitoring period_10.02.2010 to 10.01.2011_v4.pdf) | 25/01/2020 | | | Required (PDD 02.11.2012_v6.pdf) | 09/03/2020 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (PDD 19.11.2010_v3.pdf) | 09/03/2020 | | | Required (PDD 02.11.2012_v6.doc) | 09/03/2020 | | | Other (PDD 30.11.2009_v2.pdf) | 09/03/2020 | | | Other (GS Validation Report 08.05.2010_v2.1.pdf) | 09/03/2020 | | | Other (GS Verification Workplan 28.01.2013.pdf) | 09/03/2020 | |