Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS5073 Markdown Content: #### GS5073 - Jbel Sendouq-Khalladi (“Khalladi”) wind farm project in Morocco ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS Passport 10.04.2017_v1.1.pdf) | 02/04/2021 | | | Required (PDD 26.07.2015_v2.pdf) | 02/04/2021 | | | Other (DEV_311.pdf) | 25/09/2024 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS5073 Validation Report_17.10.2017_v1.pdf) | 02/04/2021 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (ER calculation_v 3.3(1).xlsx) | 08/02/2024 | | | Other (GS4GG MR_05-02-2024 Clean.pdf) | 08/02/2024 | | ###### Transition Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)GS5073 Transition Annex_v4.docx) | 02/04/2021 | | ###### Transition Review (GS CDM to GS VER) | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (T-V5.0-Deviation-Request-Form_5073.pdf) | 09/11/2022 | | | Other (T-V5.0-Deviation-Request-Form_5073(1).pdf) | 26/03/2024 | | | Supporting (T-PreReview_V1.0-Transition-request-form-project.pdf) | 19/09/2022 | | | Other (DEV_588.pdf) | 26/03/2024 | | | Other (T-V5.0-Deviation-Request-Form_clean(1).pdf) | 26/03/2024 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (T-PreReview_V1.5-Project-Design-Document-5_Clean.docx) | 28/03/2025 | | | Other (GS5073_Validation report_clean.pdf) | 28/03/2025 | | | Other (GS5073_Final_SDG Impact Tool_ACWA Power(1).xlsx) | 28/03/2025 | | | Required (Khalladi_ER_26 Apr 2024.xlsx) | 30/04/2024 | |